Boiler flushing pipe granulator, boiler flushing pipe slag collector
Boiler flushing pipe granulator, boiler flushing pipe slag collector
Boiler flushing pipe granulator, boiler flushing pipe slag collector

Boiler flushing pipe granulator, boiler flushing pipe slag collector

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
1000000 Piece / Pieces per Month
Payment Terms:
T/T

Quick Details View All >

Shape:
Other
Connection:
Flange
Head Code:
Other

Hebei Zexu Pipeline Manufacturing Co., Ltd.

Business license
Cangzhou Hebei China
Main Products: Pipe fittings , flanges , steel pipes and pipe fittings

Product Details

Boiler blowing pipe granulator, boiler blowing pipe slag collector, boiler flushing pipe granulator is suitable for superheater, main steam pipeline, superheater reheater and other related pipeline system, thermal power plant, boiler pipeline system after installation and maintenance, Since some welding slag, scale, and other industrial waste exist in the system pipeline during the installation and manufacturing process, according to the requirements of "Technical Specifications for Construction and Acceptance of Electric Power Construction", steam must be flushed before the unit is started to ensure steam turbine equipment Safe operation. The specific method is as follows: after the temporary blowpipe control door, a granulator is installed, and the industrial waste recovery in the pipeline is discharged from the sewage discharge part, so that the industrial waste can be prevented from entering the related flow.


Boiler blowpipe granulator, boiler blowpipe slag collector, boiler blowpipe granulator according to the standard:


1. Made according to the standard of steel pressure vessel


2. The inspection shall be carried out according to the GB12349-94 standard and the power construction and acceptance technical specification DCT5047-95.


3. According to the thermal power unit to start the steam blower, the 1998 version is implemented


4. The welding process is carried out according to the welding process evaluation


5. According to the thermal power engineering adjustment trial operation quality inspection and evaluation standards


6. Execute according to DTL852-2004 boiler start-up debugging hand.


Contact Supplier

Ms. Zhao Lijun manager Chat Now
Telephone
86-0317-5128772
Mobile
86-13603178097
Fax
86-0317-6390552
Address
Yanshan Cangzhou,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Pipe Fittings
Categories
Hi~