Dongfeng 6CT truck engine parts Oil pressure sensor 3968300 3846N06-010-C1
USD $5.6 - $16.2 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
Diesel engine parts M11 QSM11 engine oil cooler core 4386525
Aftermarket Parts dongfeng diesel engine parts 6L ISLE QSL9.3 oil cooler core 3966365
diesel engine parts VDO water temperature sensor 1/2 NPT MAX 120 Centigrade
Diesel engine parts M11 ISM11 QSM11 Exhaust manifold 3104237 manifold exhaust
high quality generator sets parts speed control unit speed governor controller ESD5500E high quality
Products Description
Dongfeng 6CT truck engine parts Oil pressure sensor 3968300 3846N06-010-C1 | |||
Part name | oil pressure sensor | Part number | 3968300 3846N06-010-C1 |
Brand | 6CT | Quality | Guranteed |
MOQ | 1 pcs | Application | truck |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |