Diesel engine 6BT engine water tank inlet pipe 13N12-03011
USD $3 - $20 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
hot sale machinery Diesel engine spare parts AS0606200SS flexible hose
Dongfeng truck diesel engine fuel oil pipe 3930678 oil tube high quality
generator set parts ISLE engine air intake pipe elbow 3682674
Diesel engine parts K38 KTA38 engine silicone plain hose 3067371
11N20-18014 Diesel Engine parts rubber hose air outlet for turbocharger
Diesel Engine Parts ISBE ISDE Oil Drain Connection Tube 3942597 fuel high pressure pipe
Products Description
Diesel engine 6BT engine water tank inlet pipe 13N12-03011 | |||
Part name | engine water tank intake pipe | Part number | 13N12-03011 |
Brand | dongfeng | Quality | Guranteed |
MOQ | 6 pcs | Application | truck |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |