QSB6.7 engine lower repair gasket kit 4955230 full gasket overhaul repair gasket kit
USD $16 - $50 /Set
Min.Order:1 Set
Shiyan Sanfeng Auto Parts Co., Ltd.
Diesel engine NT855 NTA855 cylinder head gasket set 4058790 3047402
high quality NTA855 Rocker arm cover gasket 3049187 seal gasket
heavy machinery diesel engine K50 kta50 cylinder head gasket 3634644
high quality diesel engine spare part M11 QSM11 ISM11 water pump repair kit 3803261 2882146 4024817
Diesel engine spare parts QSK engine injector copper gasket seal 207244
Products Description
QSB6.7 engine lower repair gasket kit 4955230 full gasket overhaul repair gasket kit | |||
Part name | gasket kit | Part number | 4955230 |
Brand | dongfeng | Quality | high level |
MOQ | 1set | Application | QSB6.7 engine |
sample | accepted | warranty | 6 months |
place of origin | Chongqing | Packing | carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Part name | Engine type | Part number |
engine repair kit | 6BT | 4089649 3802376 |
engine repair kit | NT855 | 3801330 3801468 |
engine repair kit | k38 upper | 3803600 |
engine repair kit | K38 lower | 3801719 |
engine repair kit | K50 upper | 3800731 |
engine repair kit | K50 lower | 3804300 |
engine repair kit | M11 | 4089478 4089998 |
engine repair kit | ISF3.8 | ISF3.8 engine repair kit |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
Our exhibition at Shanghai Automachanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |