high quality diesel engine parts fan belt pulley 3914458 for construction machinery
USD $5.5 - $8.8 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
High level 6BT diesel engine spare parts belt tensioner 3914086
High performance 4BT diesel engine spare parts belt tensioner 3924026
ISDE Dongfeng Electrical series engine Belt tensioner 4936440
Diesel engine parts NT855 accessory drive belt pulley 3013336
3013336 Diesel engine parts NT855 accessory drive belt pulley
Products Description
high quality diesel engine parts fan belt pulley 3914458 for construction machinery | |||
Part name | Pulley | Part number | 3914458 |
Brand | dongfeng | Quality | Guranteed |
MOQ | 6 pcs | Application | machinery |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |