Excavator engine parts for C11 C13 diesel fuel injector 249-0713 Common Rail Injector
USD $125 - $350 /Piece
Min.Order:1 Piece
Anqing Hengruixing Auto Parts Co., Ltd.
Piston Ring for C6.6 Diesel engine parts 276-7476 for E320D excavator
Engine spare parts main bearing for 3400 4W5492 9Y9497 9Y7735
diesel fuel injector C7 C9 common rail injector 236-0962 for E330C excavator
for C6.6 engine crankshaft ZZ90242 use for Excavator 320D 323D
Hot selling cylinder head gasket for 3306 2941682 2228331 in stock
Produce Name:Excavator engine parts for C11 C13 diesel fuel injector 249-0713 Common Rail Injector
Material | Alloy |
Packing | Box |
Appliion | Engine Parts |
Item name | injector for C11/ C13 |
Certifie | ISO9001 |
MOQ | 1 Pc |
Engine type | Diesel Engine |
Payment terms | T/T, Paypal, Western Union |
Quality | Guaranteed |
Delivery Time | 5 Days |
Anqing Hengruixing Autoparts Co., Ltd. Located at Anqing 1.3 kilometer industrial zone, it’s mainly researches, develops and manufactures,
And we’re also a professional automobile, forklift and engineering machinery parts supplier, like air filter, fuel filter, ignition coil, shock absorber, C V joint, control arm, head lamp, rear lamp, bumper, water pump, oil pump, connecting rod, head gasket, clutch cover, engine bearing, piston, piston ring, engine valve, valve guide, valve seat, crankshaft, camshaft, starter, alternator etc.
With the first-class products, excellent service, fast delivery and best price, we have won many foreign customer’s praise. Our producets has been exported to Africa, the Middle East, Southeast Asia and other regions.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7 -30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.