Excavator engine parts for 6D125 connecting rod 6150-31-3100
USD $35 - $35 /Piece
Min.Order:1 Piece
Anqing Hengruixing Auto Parts Co., Ltd.
For Machinery engine spare parts 4D95S con rod bearing 6204-31-3400 for sale
for S6D155 engine full gasket set 6128-K2-9901 6128-K1-9901 overhaul repair kit
for S6D108 engine full gasket set 6221-K1-9900 6221-K2-9900 overhaul repair kit
Diesel engine parts for 6D114 S6D114 Water Pump 6742-01-3670
for PC120-6 Excavator 4D95 S4D95 engine Water Pump 6204-61-1104
Product Name: Excavator engine parts for 6D125 connecting rod 6150-31-3100
Material | Alloy |
Packing | Box |
Appliion | Engineering Machinery Engine |
Item name | connecting rod |
Certifie | ISO9001 |
MOQ | 1 Pc |
Engine type | Diesel Engine |
Payment terms | T/T, Paypal, Western Union |
Quality | Guaranteed |
Delivery Time | 5 Days |
Anqing Hengruixing Autoparts Co., Ltd. Loed at Anqing 1.3 kilometer industrial zone, it’s mainly researches, develops and manufactures,
And we’re also a professional automobile, forklift and engineering machinery parts supplier, like air filter, fuel filter, ignition coil, shock absorber, C V joint, control arm, head lamp, rear lamp, bumper, water pump, oil pump, connecting rod, head gasket, clutch cover, engine bearing, piston, piston ring, engine valve, valve guide, valve seat, crankshaft, camshaft, starter, alternator etc.
With the first-class products, excellent service, fast delivery and best price, we have won many foreign customer’s praise. Our producets has been exported to Africa, the Middle East, Southeast Asia and other regions.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7 -30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.