original/aftermarket engine parts motorcycle camshaft 3062076 3074311 K38 camshaft for construction machinery parts
USD $266 - $355 /Piece
Min.Order:1 Piece
Shiyan Sunon Automobile Part Co., Ltd.
specification | |
Part Name | original/aftermarket engine parts motorcycle camshaft 3062076 3074311 K38 camshaft for construction machinery parts |
Application | Construction machinery-Mrine, diesel(excavator/wheel loader/crane/bulldozer) |
Part No. | 3062076 3074311 |
Model | K38 |
Packing | original packing/neutral packing |
Trade Term | EXW,FOB,CNF,CIF,etc |
Export Port | Shanghai/ Ningbo /Shengzhen /Guangzhou/ Qingdao/ Tianjin |
Place of Origin | Shiyan City, Hubei |
Company information
Shiyan Sunon Automobile Parts Co., Ltd located in Shiyan Bailang High Technology Development Zone, a city of motor.
Product Range
No. | Product |
1 | cylinder/ cylinder head/ cylinder block/ cylinder liner |
2 | piston/ piston pin/ piston ring/ piston tappet |
3 | camshaft/ crankshaft |
4 | fuel transfer pump/ oil pump/ oil pan/ oil filter |
5 | radiator assembly/ charge air cooler |
6 | truck starter/ generator/ |
7 | water pump/ air compressor |
8 | injector/ gear/ gear housing |
9 | cooling system/ fan / bracket/ oil seal/ gasket
|
More details are as follows:
1. Genuine diesel engine Parts and engine assembly (4BT, 6BT, 6CT, 6L, ISBE, ISDE, ISLE,
ISF2.8, ISF3.8, NTA855, KTA19,KTA38, KTA50, M11, ISM series)
2.Cylinder Block, Cylinder Head, Cylinder Liner, Cylinder Gasket.
3.Crankshaft, Camshaft, Main Bearing, Thrust Bearing.
4.Water Pump, Oil Pump, Air Compressor, Fuel transfer pump.Turbocharger, air compressor,
intake pipe, air filter, exhaust pipe,Fuel injection pump, injector, injector fuel supply tube, fuel manifold, fuel filter
5.Piston, Piston Pin, Piston Ring, Piston Cooling Nozzle.
6.Connection Rod, Bushing, Gear, Gear Housing, Belt Tensioner.
7.Electronic control module, pressure sensor, position sensor,temperature sensor,
pressure switch, etc
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 1)As for sample order T/T or western union 100% before delivery!
2)As the bulk order T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 3-5 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.