factory supply motorcycle spare parts 3028075 N14 NT855 Camshaft bushing
USD $0.15 - $25 /Piece
Min.Order:1 Piece
Shiyan Sunon Automobile Part Co., Ltd.
specification | |
Part Name | China factory supply motorcycle spare parts 3028075 N14 NT855 Camshaft bushing for Excavator/wheel loader/dozer parts |
Application | Construction machinery-Mrine, diesel(excavator/wheel loader/crane/bulldozer) |
Part No. | 3028075 |
Model | N14 NT855 |
Packing | original packing/neutral packing |
Trade Term | EXW,FOB,CNF,CIF,etc |
Export Port | Shanghai/ Ningbo /Shengzhen /Guangzhou/ Qingdao/ Tianjin |
Place of Origin | Shiyan City, Hubei |
Our hot sale camshaft bushing: M11 camshaft bushing, QSC8.3 camshaft bushing, NTA855 camshaft bushing, ISF2.8 camshaft bushing, ISF3.8 camshaft bushing, 6BT camshaft bushing, KTA19 camshaft bushing, 4BT camshaft bushing, QSB6.7 camshaft bushing, QSB5.9 camshaft bushing, ISDe camshaft bushing, ISBe camshaft bushing
These camshaft bushing is brand new and factory directly supply. The quality of these camshaft bushing has high and stable quality.
Company information
Shiyan Sunon Automobile Parts Co., Ltd located in Shiyan Bailang High Technology Development Zone, a city of motor.
Product Range
No. | Product |
1 | cylinder/ cylinder head/ cylinder block/ cylinder liner |
2 | piston/ piston pin/ piston ring/ piston tappet |
3 | camshaft/ crankshaft |
4 | fuel transfer pump/ oil pump/ oil pan/ oil filter |
5 | radiator assembly/ charge air cooler |
6 | truck starter/ generator/ |
7 | water pump/ air compressor |
8 | injector/ gear/ gear housing |
9 | cooling system/ fan / bracket/ oil seal/ gasket
|
More details are as follows:
1. Genuine diesel engine Parts and engine assembly (4BT, 6BT, 6CT, 6L, ISBE, ISDE, ISLE,
ISF2.8, ISF3.8, NTA855, KTA19,KTA38, KTA50, M11, ISM series)
2.Cylinder Block, Cylinder Head, Cylinder Liner, Cylinder Gasket.
3.Crankshaft, Camshaft, Main Bearing, Thrust Bearing.
4.Water Pump, Oil Pump, Air Compressor, Fuel transfer pump.Turbocharger, air compressor,
intake pipe, air filter, exhaust pipe,Fuel injection pump, injector, injector fuel supply tube, fuel manifold, fuel filter
5.Piston, Piston Pin, Piston Ring, Piston Cooling Nozzle.
6.Connection Rod, Bushing, Gear, Gear Housing, Belt Tensioner.
7.Electronic control module, pressure sensor, position sensor,temperature sensor,
pressure switch, etc
Packing & Shipping
1. Delivery time
Within 5 working days after receiving your payment
2. Price item
EXW, FOB,etc. can help to contact freight forwarder
3. Payment terms
Western Union,Money Gram, Paypal,T/T,L/C at Sight
4. Warranty
6 months
5. Trade item
EXW,FOB,CNF,CIF,CFR
6. Main Port
Shanghai/ Ningbo /Shengzhen /Guangzhou/ Qingdao/ Tianjin
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 1)As for sample order T/T or western union 100% before delivery!
2)As the bulk order T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 3-5 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.