Spring tension assy excavator track adjuster cylinder for PC56-7 from jining Qianyu Company
USD $30 - $30 /Piece
Min.Order:1 Piece
Jining Qianyu Commercial & Trade Co., Ltd.
Excavator Undercarriage Spare Part Pc220-8 Pc200-8 Track Roller 20Y-30-00016 Rollers
QIANYU Bulldozer Undercarriage Spare Part D155 175-30-00525 Idler 175-30-00575 Front Idler
Excavator PC200-7 PC300-7 PC400-7 Bucket Link Bushing 207-70-72460 207-70-61521 207-70-32150 Bushing
excavator PC360-7 bucket arm link 207-70-00480 pin and bushing link
Spring tension assy excavator track adjuster cylinder for PC56-7
Our company can supply genuine spare parts
1) Undercarriage spare parts: Track shoe, Track Link, Bolt, Track roller, Carrier Roller, Sprocket, Front Idler, Idler Cushion
2) Engine spare parts: Cylinder Head, Cylinder Block, Turbocharger, Piston, Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump, Water Pump, Alternator, Starting Motor
3) Hydraulic spare parts: Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor
4) Operator’s Cab spare parts: Cab Ass’y, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor
- Hydraulic Spare Parts
Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor…
- Engine Spare Parts
Turbocharger, Oil Pump, Fuel Injection Pump, Water Pump, Alternator, Starting Motor…
- Fuel Tank And Related Parts
Strainer, Sensor, Fuel Tank, Water Separator,…
- Operator’s Cab Spare Parts
Cab, Monitor, Controller, Engine Controller, Seat, Air Conditioner, Air Compressor…
- Work Equipment
Tube, Cylinder, Arm, Bucket Cylinder, Link, Bucket Link, Bushing, Bucket, Tooth, Adapter Cutter…
- Electrical System
Cable, Battery, Alternator, Light, Relay, Monitor, Starting Motor, Air Conditioner, Controller…
- Cooling System
Radiator Core, Oil Cooler, After Cooler, Condenser, Air Cooler, Radiator…
- Undercarriage Spare Parts
Track Shoe, Track Link, Track Roller, Carrier Roller, Sprocket, Front Idler …
Q1:How long is the warranted time?
For natural broken, 3 months. Guarantee genuine parts.
Q2: What's payment you can accept?
T/T, WESTERN UNION, CHINESE BANK,PAYPAL.
Q3: What's package? Can you give me the package according my requirement?
Yes, Original packing or Neutral packing with wooden box or carton.
Q4: How about the lead time?
1) In stock: 1-3days.Always in 24 hours.
2) Out of stock: It's according to your quantity, and we have cooperated with factory. We will let you know when we quote.
Q5: What's the shipping way you can offer?
1) Big order: By sea or by air.(It can reduce the costs).
2) Small order: DHL, TNT, UPS, FEDEX, EMS,ARAMEX.
Q6: Whta's the terms of the transaction?
EXW, FCA, FAS, FOB, C&F, CIF, CPT, CIP, DAF, DES,DDP.
Q7: Do you accept small order?
Yes, small order can accept.
Q8: What's brand you can offer in your company?
1) OEM, 100% GENUINE PARTS, COPY(Made in China).
2) GENUINE PARTS.
1.Parts can be shipped in 3 days after get your deposit. 2.Standard package or to your request 3.According to the goods to choose the best shipping method.
|