high quality original and new main valve for DX300 part number 420-00519 hot sale
USD $2,500 - $2,500 /Piece
Min.Order:1 Piece
Jining Qianyu Commercial & Trade Co., Ltd.
original and new main valve 420-00519 for DX300 hot sale from China suppliers
original and new main valve for DX300 part number 420-00519 hot sale from China
Excavator PC70-7 PC60-7 Control Valve 723-27-11100 723-27-10104 Hydraulic Valve Price
DX300LC Main Control Valve 420-00519 42000519 Control Valve Ass'y
pilot valve assy for pc200-7/pc220-7/pc350-7 part number 702-21-55901 hot sale in China
main valve 420-00519 hydraulic control valve for Doosan DX300
Our company can supply genuine spare parts
| Model |
| PC40, PC60-5-6-7, PC100, PC120, PC130, PC240, PC200-1-3-5-6, PC220-1-3-5, PC300-3-5, PC4001-3-5, D20, D30, D31, D50, D60, D75, D80 (D85), D155 |
| EX40, EX60, EX150, EX100M, EX100, EX120, EX150, EX200-1-2-3, EX300-1-3-5, EX400, UH08, UH07 |
| E110B, E200B (E320), E240 (MS180), E300B, E330, D3C, D5, D5B, D5D, D6C, D6D, D6H, D7G, D8K |
| DH220, DH280, |
| R200, R210 |
| HD250, HD400 (HD450), HD500, HD550, HD700 (HD770), HD800, HD820, HD850, DH880, HD1020, HD1220 (HD1250), HD1430, DH1880 |
| SK07N2, SK07-7SK200, SK220, SK300, SK320 |
| SH120, SH200, SH280, SH300, SH400 |
| MS110, MS120, MS180 |
| SE55, SE210 |
Company Information -------- Qianyu -------- |
Jining Qianyu Commercial & Trade Co., Ltd. is specialized in the wholesale and retail of bulldozers, excavators and other construction machinery and parts. Located in the famous construction machinery city - Jining, Shandong Province, which is the base of bulldozer and excavator factories, we enjoy special advantages to supply all machinery parts with good quality and competitive prices. We adhere to the tenet of "Quality First, Credit First". We would like to establish long-term friendly business relationships with your esteemed company. If you are interested in our products, please contact us directly. We are looking forward to your inquiries.
|
- Hydraulic Spare Parts
Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor…
- Engine Spare Parts
Turbocharger, Oil Pump, Fuel Injection Pump, Water Pump, Alternator, Starting Motor…
- Fuel Tank And Related Parts
Strainer, Sensor, Fuel Tank, Water Separator,…
- Operator’s Cab Spare Parts
Cab, Monitor, Controller, Engine Controller, Seat, Air Conditioner, Air Compressor…
- Work Equipment
Tube, Cylinder, Arm, Bucket Cylinder, Link, Bucket Link, Bushing, Bucket, Tooth, Adapter Cutter…
- Electrical System
Cable, Battery, Alternator, Light, Relay, Monitor, Starting Motor, Air Conditioner, Controller…
- Cooling System
Radiator Core, Oil Cooler, After Cooler, Condenser, Air Cooler, Radiator…
- Undercarriage Spare Parts
Track Shoe, Track Link, Track Roller, Carrier Roller, Sprocket, Front Idler …
Q1:How long is the warranted time?
For natural broken, 3 months. Guarantee genuine parts.
Q2: What's payment you can accept?
T/T, WESTERN UNION, CHINESE BANK,PAYPAL.
Q3: What's package? Can you give me the package according my requirement?
Yes, Original packing or Neutral packing with wooden box or carton.
Q4: How about the lead time?
1) In stock: 1-3days.Always in 24 hours.
2) Out of stock: It's according to your quantity, and we have cooperated with factory. We will let you know when we quote.
Q5: What's the shipping way you can offer?
1) Big order: By sea or by air.(It can reduce the costs).
2) Small order: DHL, TNT, UPS, FEDEX, EMS,ARAMEX.
Q6: Whta's the terms of the transaction?
EXW, FCA, FAS, FOB, C&F, CIF, CPT, CIP, DAF, DES,DDP.
Q7: Do you accept small order?
Yes, small order can accept.
Q8: What's brand you can offer in your company?
1) OEM, 100% GENUINE PARTS, COPY(Made in China).
2) GENUINE PARTS.
1.Parts can be shipped in 3 days after get your deposit. 2.Standard package or to your request 3.According to the goods to choose the best shipping method.
|