Dry mix concrete shotcrete machine
USD $1800 - $4500 /Set
Min.Order:1 Set
Henan Gengli Engineering Equipment Co.,Ltd
Application of Tunnel use dry mix shotcrete machine for sale
PZ-7D Wet-mix shotcrete machine is widely used in concrete spray construction operations of mining tunnels, culverts, subways, hydropower projects, underground works of concrete spray construction operations
Specification | |
Name | Tunnel use concrete dry mix shotcrete machine for sale |
Production Capacity | 7m³/h |
Working Pressure | 0.4-0.6Mpa |
Maximum Aggregate Diameter | 20mm |
Total Weight | 800kg |
Overall Dimension(L*W*H) | 1660*800*1100mm |
Maximum Conveying Distance | 200/20m(Horizontal/Vertical) |
Maximum Air Consumption | 12m³/min |
Main Motor Power | 7.5kw |
Voltage Classes | 380V |
Inner Diameter of Conveying Pipe | Φ57mm |
Rotary speed of rotor | 11r/min |
Feeding Height | 1.1m |
Features of Tunnel use dry mix shotcrete machine for sale
1. Compact structure, stable performance, convenient operation and maintenance
2. Simple process, easy operation, long delivery distance
Photos of Tunnel use dry mix shotcrete machine for sale
Package and Delivery
1. Normally packed with wooden box, wooden frame but according to your demands
2. Handling time: Within 2 week. But if the model you asked are in stock, the warehouse will arrange delivery within 3 days
Photo at the working site
FAQ
1. Which model is suitable for us ?
We're a manufacturer. All kinds of models are available.Before recommend suitable model, please tell us the application, materials, working capacity , your working condition , etc.
2. How do I operate the machine ?
Please read the Operation Instruction for basic technical skills.If necessary, we provide online and onsite technical training.
3. What should I do if there is problem with the machine?
Firsly, please refer to the Operation Instruction
Secondly, please call us at any time
Thirdly, engineers are available for overseas service
4. How long the handling time ?
If there are models in stock, the warehouse will arrange delivery within 3-5 days
If no stock, normally the handling time is 2 weeks but also according to the quantity you need
5.How about package ?
Normally use wooden box or wooden frame. Your other demands are accepted
6.Payment
In general, 30%T/T prepayment before production, 70% T/T balance payment against copy of B/L
L/C is also accepted