Low Pressure 1/4'' Gas Flow Control Hand Operated Needle Valve
USD $5 - $100 /Piece
Min.Order:1 Piece
PTFE Screwed End Filter Strainer Valve Y Type Brass Ball Valve
Q71F Stainless Steel 304/316 Casting Floating Flange Ball Valve DN50
NPT Thread End 1000PSI Brass Casting SS316 Two Piece Ball Valve ASME
ISO Thread End 1000PSI 316 Stainless Steel Two Piece Ball Valve
H41H-25C Flange Type Carbon Steel Lift PN40 Check Valve 2.5MPa,4.0MPa
One.Product data:
1/2''Gas Flow Control Hand Operated Needle Valve
Pressure | PN 1.6, 2.5, 4.0, 6.4 MPa |
Strength testing pressure | PT2.4, 3.8, 6.0, 9.6 MPa |
Seat testing pressure (Low pressure) | 0.6 MPa |
Applicable Media | Q11F-(16-64)C Water, Oil, Gas |
Applicable temperature | -29~180 ℃ |
Two related product:
Three.Company profile
Tianjin Nbestvalve Co., Ltd. was established in 2002, headquartered in No.21,No.1 Building, Ronghui Business Zone, Zhongguancun technology Park, Binhai New District, Tianjin, China. With the rapid development of the most dynamic Chinese Bohai Economic Rim, Our company, production, sales and manufacturing test capabilities, with independent import and export rights, is a science, industry and trade as one of the group enterprise.
Four.Aplication Area
a. Domestic sewage treatment.
b. industrial wastewater treatment.
c. industrial irrigation treatment.
Five.Packing and Freight
Six.FAQ
Q: Are you trading company or manufacture?
A: We are factory located in Tianjin, China.
Q: What's your product range?
A: We specialize in product butterfly valves,solenoid valve, gate valves, check valves, Y type strainer, water controlling valves,motorized valves,pneumatic valves,hydraulic valves and other pipe accessories.
Q: What's execution standard?
A: ISO/ANSI/DIN/JIS/EN/GOST standard.
Q: What's your strong product?
A: Concentric butterfly valves, grooved butterfly valves, dual plate check valves.
Q: Do you provide sample? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of the freight.
Q: How long is your delivery time?
A: Generally it is 7 days if the good are in stock, or it is 20 days if the goods are not in stock, it is according to the quantity.
Q: What is your terms of payments?
A: Payment ≤10000 USD, 100% in advance. Payment ≥10000USD, 30% T/T or other ways in advance, balance before shipment.
Seven.Contact us