JDL-300 Mud/Air Drilling Rig/Multi-function water drill/Full hydraulic drill rig exploration rig
USD $30400 - $30600 /Set
Min.Order:1 Set
Shandong Huaxia Machinery co., LTD
FY180 crawler pneumatic water well drilling rig/Household pneumatic water well drill rig
Pneumatic well drill FY200 crawler pneumatic water well drilling rig/Pneumatic drill machine
FY260 crawler pneumatic water well drilling rig/260m crawler type deep well drill equipment
FY300 crawler pneumatic water well drilling rig/High efficiency and simple operation
FY400 crawler pneumatic water well drilling rig/dth water drill machine
JDL-300 Mud/Air Drilling Rig
1. Introduction of JDL-300 mud/air drilling rig
JDL-300 mud/air drilling rig is a water well drilling rig that mix mud drilling rig and air drilling rig in one equipment with mechanical top head. It is a good solution to the difficulty of drilling in the soil layer for DTH rig and the low efficiency of drilling for mud rotary rig in the hard rock, gravel and pebble layer. The mud/air drilling rig adapts to various soil strata. The mud/air drilling rig is efficiency and energy saving to drill water well and geological exploration of core sample.
2. Features of JDL-300 mud/air drilling rig
·The rig can be equipped with a five-speed manual integrated gearbox, hydraulically separated bearings, full synchronizer shifting, high reliability and long service life.
·The drilling rig adopts a mechanical winch, which has a fast lifting speed and is easy to handle the bottom hole accident.
3. Parameters of JDL-300 mud/air drilling rig
JDL-300 mud/air drilling rig | ||
Working stratum | Loose soil layer and bed rock(hardness:F6~20) | |
Drilling method | Mechanical top head rotation, hydraulic feeding, work with mud pump or DTH. | |
Drilling capacity | Φ42 Mud drilling depth | 530m |
NQ wireline coring | 600m | |
Φ75 Air Drilling depth | 300m | |
Borehole dia. | ≤Φ350 | |
Power | Diesel engine model | YN27 |
Rated power | 42kw | |
Rated speed | 2400rpm | |
Drive head | Rotary speed | 50~10200r/min |
Max. torque | 5000N.m | |
Feeding system | Lifting capacity | 4T |
Thrusting capacity | 2.1T | |
Winch capacity | Hydraulic tool winch(optional) | 1.5T |
Mechanical winch | 4.5T | |
Drill pipe | Drill pipe dia. | Φ76/Φ89/Φ102 |
Drill pipe length | 3000mm | |
Crawler chassis | Walking speed | 0~2km/h |
Climbing angle | 20° | |
Dimension | Transport | 5380*1575*2500mm |
Working | 3480*1575*6280mm | |
Weight | 4380kg | |
Air compressor | Air pressure | 10.5~24.6bar |
Air consumption | 16~35m³/min |
The above parameters are subject to change without prior notice.
Shandong Master Machinery Group specializes in mud/air drilling rig. The main models are JDL-300 and JDL-400.