1'' With Female Thread And Male Thread Water Brass Ball Valve
USD $5 - $100 /Piece
Min.Order:1 Piece
1/4'' Gas Flow Control Hand Operated Low Pressure Needle Valve
SS304 BSP Thread End 1000PSI Two Piece Stainless Steel Ball Valve
Stainless Steel 316 ISO Wafer Type Casting Floating Flange Ball Valve
DN150 H77J-10Q Wafer Butterfly Check Valve 6 Inch Stainless Steel
DN200 Dual Iron Manual Wafer Butterfly Check Valve Low Temperature
One.Product data:
3/4''Gas Brass Ball Valve with female thread and male thread
Pressure | PN 1.6, 2.5, 4.0, 6.4 MPa |
Strength testing pressure | PT2.4, 3.8, 6.0, 9.6 MPa |
Seat testing pressure (Low pressure) | 0.6 MPa |
Applicable Media | Water, Oil, Gas |
Applicable temperature | -29~180 ℃ |
Two related product:
Three.Company profile
Tianjin Nbestvalve Co., Ltd. was established in 2002, headquartered in No.21,No.1 Building, Ronghui Business Zone, Zhongguancun technology Park, Binhai New District, Tianjin, China. With the rapid development of the most dynamic Chinese Bohai Economic Rim, Our company, production, sales and manufacturing test capabilities, with independent import and export rights, is a science, industry and trade as one of the group enterprise.
Four.Aplication Area
a. Domestic sewage treatment.
b. industrial wastewater treatment.
c. industrial irrigation treatment.
Five.Packing and Freight
Six.FAQ
Q: Are you trading company or manufacture?
A: We are factory located in Tianjin, China.
Q: What's your product range?
A: We specialize in product butterfly valves,solenoid valve, gate valves, check valves, Y type strainer, water controlling valves,motorized valves,pneumatic valves,hydraulic valves and other pipe accessories.
Q: What's execution standard?
A: ISO/ANSI/DIN/JIS/EN/GOST standard.
Q: What's your strong product?
A: Concentric butterfly valves, grooved butterfly valves, dual plate check valves.
Q: Do you provide sample? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of the freight.
Q: How long is your delivery time?
A: Generally it is 7 days if the good are in stock, or it is 20 days if the goods are not in stock, it is according to the quantity.
Q: What is your terms of payments?
A: Payment ≤10000 USD, 100% in advance. Payment ≥10000USD, 30% T/T or other ways in advance, balance before shipment.
Seven.Contact us