Seamless Steel tube for Automobile Carbon Welded Hot Dip
Negotiable /Piece
Min.Order:1 Piece
Shandong Paipu Steel Co., Ltd.
FAQ:
Q: What is necessary informations?
A: In order to get accurate quotation, the standard, material, outer diameter, wall thickness,
quantity, destination port are necessary informations.
Q: When is the earliest delivery date?
A: If these steel pipes are in stock, the delivery time is 7 days. The longest delivery time is 30
days to order.
Q: What is packing type?
A: Bundled with knitted plastic bag, wooden cases or Ply-wooden Case /Iron Case/ Bundle with plastic Cap or as per customers' requirement.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Sure we can help you with the shipment.
Professional work Team Serving for you:
Application:
• Low pressure liquid delivery such as water,gas and oil
• Construction
Inspection:
With Hydraulic Testing, Eddy Current , Infrared Test
Class A test pressure:4.83MPa-13.10Mpa
Delivery:
• Container • Bulk Cargo
Addition:
• Anti-corrosion and high-temperature resistant with black painting
Specification:
Product Name | OD48.3mm BS1139 Galvanized Scaffolding Pipe Steel Tube | ||
Size | OD | 20~406mm(1/2inch~16inch) in theory | |
Thickness | 1.2~15.7mm | ||
Length | Any Length Below 16 Meter | ||
Standard | GB/T3091-2008 ASTM A53 BS1387 BS EN39 ASTM A500 BS 4568 BS EN31 | ||
Material | Chinese Grade | Q215 Q235 According to GB/T700;Q345 According to GB/T1591 | |
Foreign Grade | ASTM | Grade B,Grade C,Grade D,Grade 50 | |
EN | S185,S235JR,S235JO,E335,S355JR,S355J2 | ||
JIS | SS330,SS400,SPFC590 | ||
Usage | Used For Water, Gas, Stream, Combustible Fluids And Other Liquid Delivery | ||
Ends | Plain, Beveled, Thread With Couplings Or Sockets; Plastic Caps And Steel Rings Can Be Provided If Possible | ||
Surface | Bared, Galvanized, Oiled, Color Paint, 3PE; Or Other Anti-corrosive Treatment | ||
Inspection | With Chemical Composition and Mechanical Properties Analysis; Dimensional and Visual Inspection, Also With Nondestructive Inspection | ||
Technique | Hot Rolled Or Cold Rolled ERW | ||
Package | Hexagon Shape Bundle, Covered With Tarpaulin, Containers Or In Bulk | ||
Date of Delivery | According to The Specifications And the Quantities Of Each Contract, Time Start To Begin When We confirm the Date of the Earnest or L/C | ||
Method of Payment | T/T L/C West Union |