Product Details

DY-JDL Laboratory Temperature calibration thermocouple calibration furnace(300-1200c)

Brand Name DA YAO
Place of Origin China
Model Number DY-JDL600
Temperature Range 300-1200c
Usage Industrial
Theory Temperature Controller
Accuracy ±0.5c

Product Features

DY-JDL High-temperature thermocouple calibration tube furnace

1.Overview:

DY-JDL Thermocouple calibration furnace is a kind of electric heating system providing heat energy for thermocouple.It is made up of heating element and insulation layer.Calibration furnace can be divided into two types,namely,furnace vertical and horizontal furnace.Based on shape-appearance,it can be divided into a short one and a long one.

2.Range:

This calibration furnace contains horizontal and tubular type with or without thermostat,capable of offering temperature field (300-1200). It is used for calibrating standard thermocouple or thermal resistance.Thereinto,noble metal thermocouple calibration furnace,base metal thermocouple calibration furnace and short thermocouple calibration furnace are included.

3.Verification regulation:
JG351-1996Verification regulation of base metal thermocouple
JJG75-95Verification regulation of standard platinum-rhodium 10 and platinum thermocouple》   
JJG141-2000Verification regulation of noble metal thermocouple

4.Product model and technical parameters

Model

DY-JDL600

DY-JDL600G

DY-JDL300

DY-JDL300G

Temperature range

300-1200

300-1200

300-1200

300-1200

Heat source

electric heating

electric heating

electric heating

electric heating

Uniform temperature field

The axial deviation between the center of maximum uniform temperature field and geometric center is no greater than 10mm.

The length of uniform temperature field is no less than 60mm,

difference in temperature 1.

 

Axial temperature field

≤±0.5

≤±0.5

≤±0.5

≤±0.5

Radial temperature field

≤±0.4


≤±0.4


Furnace length

600mm

600mm

300mm

300mm

Furnace mouth

40mm

15mm

40mm

15mm

Overall dimension

625×300×360

325×300×360

Power consumption

1000w

1000w

700w

700w

Power supply

220V 50HZ

220V 50HZ

220V 50HZ

220V 50HZ

5.Preparation before testing:

Check the inner tube in the furnace before testing. Crack and obvious deformation is not allowed.

Before plugging in, Use digital multipurpose meter to measure the resistance value of heater strip under normal temperature. Usually,it should be several ohm to more than ten ohm.

With regard to calibration furnace laid aside for a long time.If necessary,drying oven process in advance is a must.

6.Testing method:

When heating-up, its power consumption should be controlled at 8A or so. In a general way,it takes 90 minutes to rise to 1000 centigrade.Test begins when it is stable (usually 60 minutes).

Preparation before testing.Alundum tube should be clean and pollution-free.Quartz tube and refractory materials used in base mental thermocouple calibration furnace is not allowed to be used in noble mental thermocouple calibration furnace.

Use straight scale to measure the distance from one end to the other and calculate the central point of calibration furnace. On the insulating tube,calculate the central point from business end.Cover the standard thermocouple with high aluminum protective tube.And the thermocouple that is being calibrated should be covered with high aluminum porcelain bead. Use fine nichrome wire to bundle these two thermocouples into circular shape.Its diameter is no greater than 20mm.

When bundling up, make the measuring terminal of thermocouple that is being calibrated circle around the measuring terminal of standard thermocouple and let it vertically lie in the same cross section of standard thermocouple.

Put the bundled thermocouple into the inside of tubular furnace.And the measuring junction of thermocouple should be in the geometric center of tubular furnaces high temperature region. Standard thermocouple has to be in the axial position of tubular furnace. The reference end of these two thermocouple must be put into the same freezing point thermostat.The depth of immersion should be same,approximately 100-150mm.

The temperature in the furnace must be controlled at a level that is close to the temperature points for testing. The difference it deviates from temperature points for testing should be no greater than ±5.When temperature variation meets the requirements of 0.2/min, measurement can be started. For further details of measurement and operation ,Please refer to the JJG3511996 verification regulation of  base mental thermocouple.

If you have any questions,please feel free to contact me!

Tel:+86 186 5382 5886

Email:tadmjd3@gmail.com


You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now