20m3 lpg skid station, 1.77Mpa lpg filling station for lpg gas tank
USD $23,000 - $24,000 /Set
Min.Order:1 Set
Dingzhou City Great Wall Daily Chemical Factory
Lpg transfer pump 110v/220v/380v,1.6Mpa transfer pump, propane transfer pump
liquid gas transfer pump for lpg filling station, lpg transfer pump, 110v/220v/380v lpg pump,
lpg filling machine with pump,cooking gas filling machine, lpg gas filling machine
20m3 lpg skid station, 1.77Mpa lpg filling tank , lpg gas filling station
electric liquid gas transfer pump, 1.6Mpa lpg transfer pump, 110v/220v/380v lpg pump,
disposable helium gas cylinders, 50lb gas cylinders, helium gas cylinders
20m3 lpg skid station, 1.77Mpa lpg filling station for lpg gas tank
Main Technical Features of LPG Skid-Mounted Station | ||||||
LPG-HW-10(20,30) | ||||||
TANK DESIGN PRESSURE MPA | 1.77MPa | |||||
TANK Maximum allowable pressure MPA | 1.92MPa | |||||
STORAGE TANK VOLUME M3 | 10 20 30 M3 | |||||
STORAGE TANK TYPE | Ⅱ(10 20) Ⅲ(30) | |||||
DESIGN PRESSURE OF PIPE MPA | 2.5MPa | |||||
DESIGN TEMPERATURE ℃ | -40~+52℃ | |||||
PIPE CLASS | GC2 | |||||
Unload flow M3/h/Mpa | 10/0.5 | |||||
Load flow M3/h/Mpa | 8/0.9 | |||||
Gas machine pressure/flow Mpa/L/min | 2.5<60 | |||||
Filling time min | 3~5 | |||||
Filling volume Time / day | 100~500 | |||||
Function | Unloading, Filling, Reversal tank, security alarms, etc | |||||
STRUCTURAL FORM | Integral type or separated type | |||||
INSTALL METHOD | Above-ground; Underground | |||||
LPG CYLINDERFILLING WEIGHT Kg | <120Kg | |||||
DIMENSION OF SKID-MOUNTED BODY | According to customers requirement | |||||
DESIGN STANDARD (CHINA STANDARD) | TSGR0004-2009 SY5985-2007 TSGD0001-2009 GB150-2011 GB50156-2012GB/T20801-2006 | |||||
MAIN VALUE AND MACHINE | ||||||
NO | PRODUCTS | SPECIFICATION | QUANTITY | PRODUCT MODEL | REMARK | |
1 | LPG STORAGE TANK | VN=10,20,30M3
| 1 | V01 |
| |
2 | STORAGE TANK SAFETY VALVE | A42Y-25 PN2.5 DN80 | 1 | A1 |
| |
3 | Piping Safety Valve | A21F-40 PN4.0 DN20 | 7 | A2~A8 |
| |
4 | GLOBEL VALVE | Q41F-25 PN2.5 DN50 | 15 | B1~4 B6~14 B16~18 |
| |
5 | GLOBEL VALVE | Q41F-25 PN2.5 DN40 | 1 | B19 |
| |
6 | GLOBEL VALVE | Q41F-25 PN2.5 DN20 | 2 | B5 B18 |
| |
7 | GLOBEL VALVE | Q41F-25 PN2.5 DN15 | 1 | B15 | Q11F-25 DN2.5 DN15 | |
8 | STOP VALVE | J41N-25 PN2.5 DN50 | 5 | C1~5 |
| |
9 | STOP VALVE | J41N-25 PN2.5 DN20 | 1 | C6 |
| |
10 | emergency shut-off valve | QDQ421F-25 PN2.5 DN50 | 2 | D1 D2 |
| |
11 | CHECK VALVE | H42N-25 PN2.5 DN50 | 1 | Z1 |
| |
12 | CHECK VALVE | H42N-25 PN2.5 DN20 | 1 | Z2 |
| |
13 | return valve | A42F-25 PN2.5 DN20 | 1 | H1 |
| |
14 | Pressure gauge | YT-100 0~4.0MPa | 3 | PT1~3 |
| |
15 | Temperature gauge | TG -40~80℃ | 1 | TG1 |
| |
16 | GAS LOADING PIPELINE | YGB-6.4 PN6.4 DN25 | 1 |
| 4M | |
17 | LIQUID LOADING PIPELINE | YGB-6.4 PN6.4 DN50 | 1 |
| 4M | |
18 | Barrel shaped Strainer
| YG-2.5 PN2.5 DN50 | 1 | E1 |
| |
19 | Pipe Strainer | YGLQ-25 PN2.5 DN50 | 1 | E2 |
| |
20 | YGF PN6.4 DN50 | 4 | F1~4 |
| ||
21 | blowdown valve | PWX-25 PN2.5 DN100 | 1 | K |
| |
22 | LPG PUMP | YQB10-5 | 1 | P0101 | Flow 10M3/h P0.5MPa | |
23 | SCREW PUMP | YHQ8-9 | 1 | P0102 | Flow 8M3/h P0.9MPa | |
24 | Electronic FILLING SCALE | GCS-120 | 1 | X010(ACB) | Max weight 120Kg | |
25 | LPG filling Gun(select) | YZA(B)-25 DN2.5 DN15 | 1 |
| I=2000min M22×15 | |
26 | Other Fittings CONNECT | DN50,DN40,DN20 | 30 |
|
| |
27 | SKID-MOUNTED |
| 1 |
|
payment term:50% tt before production, 50% tt before shipment to HSBC bank
20m3 lpg station packing: 1 tank and 1 semitrailer to be load into a containers
shipping date: about 75 days after down payment