PP PVC PE Plastic Hollow Construction Building Formwork Concrete Mould Board Making Machine
PP PVC PE Plastic Hollow Construction Building Formwork Concrete Mould Board Making Machine
PP PVC PE Plastic Hollow Construction Building Formwork Concrete Mould Board Making Machine
PP PVC PE Plastic Hollow Construction Building Formwork Concrete Mould Board Making Machine

PP PVC PE Plastic Hollow Construction Building Formwork Concrete Mould Board Making Machine

USD $160000 - $200000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
qingdao
Payment Terms:
T/T L/C

Quick Details View All >

Brand Name:
YIJINWEI
Model Number:
ACE-05
Certification:
CE
After-sales Service Provided:
Engineers available to service machinery overseas

Qingdao Yijinwei Plastic Machinery Co.,Ltd

Business Type: Manufacturer
Qingdao Shandong China
Main Products: PVC foam board machine ,Construction board production line ,plastic pipe production line ,WPC profile production line ,SPC flooring production line ,Imitation Dali stone plate production line ,PVC furniture production line ,PVC transparent sheet machine

Product Details

· product introduction and application
     
   Composite building template equipment is Qingdao
YIJINWEI Plastic machinery co., LTD., on the basis of the introduction of foreign advanced technology, independent research and development success of new environmental protection plastic building template equipment, the company technical staff after studying the product constantly upgrading, through continuous technical improvement, technology experts at home and abroad in long-term communication and repeated experiment, finally developed a new generation of products.

            It is widely used in building engineering, bridge engineering and coal mine, etc. The main purpose is to make the newly poured concrete to be formed and maintained, to make it reach a certain strength to bear the dead weight of the temporary structure and to remove the model plate.
Building formwork is a kind of temporary structure, it is made according to the design requirements, so that the concrete structure, components according to the specified position, geometric size forming, maintain its correct position, and bear the weight of the building formwork and the load acting on it.The purpose of the formwork project is to ensure the quality and safety of the concrete project, accelerate the construction progress and reduce the project cost.


·Production line configuration

1.SJ-120X35Single screw extruder1set
2.SJ-75X33Single screw extruder1set
  1. Mould

1set
4.Hydraulic automatic screen changer2set
5.Metering pump1set
6.Finalize the design stage1set
7. Vacuum, cooling water system1set
8.Front cooling bracket1set
9.tractor1set
10.Cooling bracket1set
11. After the tractor1set
12.Transverse cutter1set
13 .Suction crumbs device1set
14.Plate carrier1set
15.Auxiliary electric control device1set


Auxiliary equipment (purchased by the user) can also be purchased on behalf of the user
1.1000Kg automatic drying and mixing system1set
2.500Kg automatic drying and mixing system1set
3. Fully automatic (mechanical hand feeding) cutting saw with four edges1set
4.SWP-380crusher1set
5.20PCold water machine1set




·WHY CHOOSE YJW?
(1) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.
(2) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE and ISO9001 certificated.
(3) We put our heart into every business with aim of long term cooperation.
(4) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.

·TRADE TERMS

  1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable

  2. Delivery Time: 40 days after receipt of prepayment.

  3. Packing Method:  Packing film or wooden case

  4. Guaranteed Time:  12 months


·MACHINERUNNING TEST AND AFTER SERVICE

  1. When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.

  2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.

  3. If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours. 


Contact Supplier

Mr. Jack Liu sales manager Chat Now
Telephone
86-0532-87271579
Mobile
86-18863906118
Skype
www.qdyijinwei.com
Address
jiaozhou beiguan industrial park Qingdao,Shandong

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Foam Machinery
Categories
Hi~