OL-503E Industrial Freeze Dryer Machine 50L/day
USD $228 - $263 /Unit
Min.Order:1 Unit
OL-503E Industrial Freeze Dryer Machine 50L/day
Dehumidifier Technology parameter
Model | OL-503E |
Dehumidifying Capacity | 50L/day(30℃, 80%) |
Scope of Application | 40~50m2 |
Supply voltage | AC220-240V/50HZ |
Rated Input Current | 3.1A |
Rated Input Power | 700W |
Mode of Defrosting | Auto |
Circulating Air Volume | 450m3/h |
Mode of Drainage | Water Tank/Tube Continuously Drainage |
Operating Temperature | 5-38℃ |
Protection Mode of Compressor | 3-minute Delay Start |
N.W(kg) | 35 |
G.W(kg) | 38 |
Production Demensionmm) | 450x335x665 |
Packing Demension(mm) | 510*405*730 |
There are various colors to choose from
Zhejiang Oulun Electric Co., LTD is a specialised dehumidfiier manufacturer, only focusing on Dehumidfier & Humidifier. We mainly for researching, manufactureing and marketing of dehumidifier and humidifier for 12 years, with annual capacity 600K units
Our Tests
Our Certificates
Package:special export Carton or plywood case
Packing Size: 715*610*1032mm
20" container can hold 54 sets ;
40" container can hold 114 sets ;
40"HQ container can hold 114 sets ;
A.1 year warranty
B.1-2%Spare Parts
C.OEM & ODM are welcome
D.Trial orders are available
E.sample can be supplied in 10-15days
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and humidifiers,we are now taking the leading position of air treatment industry in mainland China. We have more than 300 employees with more than 25 engineers and 4 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to help you design your logo.
Q: Can I buy a sample for testing
A: Yes, we can supply you with a sample. for most of the models,we have them in stock. we can supply you with the sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city, Zhejiang province. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station,
we can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.
Q: What is the delivery time for bulk machine?
A:40days for first delivery,second is 30days