Ol-503E daikin dehumidifier dehumidifier price industrial dehumidifier
USD $150 - $200 /Unit
Min.Order:1 Unit
Ol-503E home dehumidifier solar powered dehumidifier refrigerator dehumidifier
50L/DAY dehumidifier pool dehumidifier dehumidifier industrial
OL-508E industrial use dehumidifier Home Dehumidifier Basement Electric Dry Dehumidifier
restoration dehumidifier rotomoulding industrial dehumidifier OL-G125
90L/DAY dehumidifier air dehumidifier drying dehumidifier adapter
90L/day dehumidifier industrial dehumidifierwholesale dehumidifier
Dehumidifier Technology parameter
Ol-503E daikin dehumidifier dehumidifier price industrial dehumidifier
Model | OL-503E |
Dehumidifying Capacity | 50L/day(30℃, 80%) |
Scope of Application | 40~50m2 |
Supply voltage | AC220-240V/50HZ |
Rated Input Current | 3.1A |
Rated Input Power | 700W |
Mode of Defrosting | Auto |
Circulating Air Volume | 450m3/h |
Mode of Drainage | Water Tank/Tube Continuously Drainage |
Operating Temperature | 5-38℃ |
Protection Mode of Compressor | 3-minute Delay Start |
N.W(kg) | 35 |
G.W(kg) | 38 |
Production Demensionmm) | 450x335x665 |
Packing Demension(mm) | 510*405*730 |
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and humidifiers,we are now taking the leading position of air treatment industry in mainland China. We have more than 300 employees with more than 25 engineers and 4 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to help you design your logo.
Q: Can I buy a sample for testing
A: Yes, we can supply you with a sample. for most of the models,we have them in stock. we can supply you with the sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city, Zhejiang province. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station,
we can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.
Q: What is the delivery time for bulk machine?
A:40days for first delivery,second is 30days