OL-KYR23-A4 Stand Support Air Conditioner With Hot And Cold Function 8000 BTU
USD $120 - $180 /Unit
Min.Order:100 Units
125 pints@AHAM Water Damage Restoration Equipment For Carpet Cleaning and Building Dryer
130 Pints Commercial Dehumidifier For Water Damage Restoration
Low Grain Refrigerant Dehumidifier for Water Damage 17 Gallon per day
Cleaning and Restoration LGR Dehumidifier Humidity Controller
Building Dryer Dehumidifier for Carpet Cleaning of AHAM 130 Pints per day
OL-KYR23-A4 Stand Support Air Conditioner With Hot And Cold Function 8000 BTU
Technology parameter
Model | OL-KYR23-A4 |
Power supply | AC220-240V/1Ph/50Hz |
Cooling capacity | 8000BTU/2350W |
Heating capacity | 6800BTU/2000W |
Power for cooling | 960W |
Power for heating | 780W |
Current for cooling | 4.3A |
Current for heating | 3.5A |
Refrigerant | R410A |
Body Size ( D*W*H ) | 320*320*745mm |
Net weight | 22kg |
Loading Quantity (20'/40'/40HQ) | 226/465/513 |
Send Inquiry >>>
Packaging
40ft container - 465pcs 40HQ container - 513pcs
|
Shipping
|
1 year warranty
0.5% Spare Parts
OEM & ODM are welcome
Trial orders are available
sample can be supplied in 10-15 days
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and humidifiers,we are now taking the leading position of air treatment industry in mainland China. We have more than 300 employees with more than 25 engineers and 4 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to help you design your logo.
Q: Can I buy a sample for testing
A: Yes, we can supply you with a sample. for most of the models,we have them in stock. we can supply you with the sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city, Zhejiang province. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station,
we can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.
Q: What is the delivery time for bulk machine?
A:40 days for first delivery,second is 30days