Chinese manufacturer produces JY-1800 insulating glass automatic CNC sealing production line
USD $6,000 - $8,000 /Set
Min.Order:1 Set
Dafei Weiye Industrial & Trading Co., Ltd.
Chinese manufacturer produces JY-1800 insulating glass automatic CNC sealing production line
Model | JY-2000 |
Power supply | 380V 50Hz |
Power | 19KW |
Air pressure | 0.5--0.8Mpa |
Max.glass.size | 2000*2500mm |
Min.glass.size | 280*450mm |
Pane glass | 3--18mm |
Total weight | 3000kg |
Boundary | 8000*2100*3200mm |
Equipment Features
1. Washing section and water system adopt complete stainless steel or rot proof materials.
2. It has 3 pairs of glass washing soft brushes for coated glass and LOW-E glass.
-- Drying section adopts rubber roller to scrape of the water,and use the hot wind to dry the glass.
--The transmit system of washing machine adopts unlimited speed adjustment to realize high efficiency of application.
1.24 hours technical support by phone, email or skype (email or skype) 1years warranty period
2.Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
3.By offering this support, we make sure the cutomer start the business smoothly, to realise win-win cooperation.
1. Are you a manufacturer?
Yes,we have been in providing the professional products in this field for 10 years.
2. how to install the machine ?
we can intrust the install the machine by vedio, email ,picture.....if large project ,
we can arrange the worker help you to install it in your country .
3. How you pack the products ?
Normally as the export standard packaging or as you required.
4. What is your available port of shipment?
Qingdao port,shanghai,tianjin,guangzhou etc.
5. Is customized available ?
Yes, according to your detailed drawings you provide
6. After Sale Service
24 hours technical support by phone, email or skype (email or skype) .
12 months warranty period.
Our senior engineer is available to travel aboard, help the installation, maintenance and
training staff.
By offering this support, we make sure the customer start the business smoothly,
to realize win-win cooperation
7. Are you trading company or manufacturer ?
We are factory and welcome to visit us at any time.
8. How long is your delivery time?
Generally single tanks need 15-30 days, for whole plant need 30-50days.
9.Do you have CE and UL certification?
Yes.
10.What is your terms of payment ?
Free contact for the most suitable machine
Free professional design for each customer especially.
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.