Insulating Glass Making Machinery Rotary Table for Sealant Spreading
USD $750 - $1,550 /Set
Min.Order:1 Set
Haijinna CNC Machinery Co., Ltd.
Insulating Glass Making Machinery Rotary Table for Sealant Spreading
Main Feature:
1. Rotary Rubber-spreading Machine is the special equipment which seals insulating glass in the level position and apply with Two-component Extruder.
2. This machine is easy to operate. Place the glass on the rotating Table and the glass will be absorbed by the sucker.
3.Rotating through the foot-switch control, is very easy to seal.
4.Pressed down the gas foot-switch after the completion of sealant, the sucker would be released and the glass could be removed.
Our service
Before payment
Free contact for the most suitable machine
Free professional design for each customer especially.
After sale service
24 hours technical support by phone, email or skype (email or skype) .
1years warranty period
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the cutomer start the business smoothly, to realise win-win cooperation.
Payment
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.
FAQ
1.Q:Are you a manufacturer?
A: Yes,we have been in providing the professional products in this field for 10 years.
2.Ask:how to install the machine ?
A:we can intrust the install the machine by vedio, email ,picture.....if large project , we can arrange the worker help you to install it in your country .
3.Q :How you pack the products ?
A: Normally as the export standard packaging or as you required.
4.Q: What is your available port of shipment?
A:Qingdao port,shanghai,tianjin,guangzhou etc.
5.Q: Is customized available ?
A: Yes, according to your detailed drawings you provide
6.Q: Are you trading company or manufacturer ?
A: We are factory and welcome to visit us at any time.
7.Q: How long is your delivery time?
A: Generally single tanks need 15-30 days, for whole plant need 30-50days.
8.Q: Do you have CE and UL certification?
A: Yes.