Manual two pump component sealant spreading machine
USD $1,980 - $8,980 /Set
Min.Order:1 Set
Haijinna CNC Machinery Co., Ltd.
Manual two pump component sealant spreading machine
Main Feature:
1.The main equipment and vice motor adopt international advanced technology ,equipment’s durability greatly improved to ensure the quality of the equipment.
2.The device curing agent is equipped with filter device high-pressure pipeline safety device make the operation more secure.Full closed system avoid the curing agent is exposed to air and curing to ensure the stability of the glue flow.
Model | JYT-03 |
Mixing ratio | 6:1-14:1 |
Material drum | 55 gallon (20L) |
Firming agent | 5 gallon (20L) |
Max. air consumption | 0.8m³/min |
Working pressure | 30Mpa |
Output | 4-10L/min |
Supply gas pressure | 0.6-1.0MPa |
Aluminum frame width | 1100*950*1980mm |
Weight | 650kg |
Jinan Truepro International is an integrated enterprise centralizing a whole body of scientific research,manufacture and distribution that specially produce aluminum window&door manufacturing equipment,aluminum covered-curtain wall equipment,PVC window & equipment and insulating glass processing equipment.Our company owns excellent team of research and development and technician which lay foundation of high-quality machines.
We offer the best balance between affordability and quality,we build quality machines for a price that can take your business to another level.We use components throughout the word,such as, Schneider Electric,OMRON PLC.
Our service
Before payment
Free contact for the most suitable machine
Free professional design for each customer especially.
After sale service
24 hours technical support by phone, email or skype (email or skype) .
1years warranty period
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the cutomer start the business smoothly, to realise win-win cooperation.
Payment
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.
FAQ
1. When can we arrange shippment?
We usually arrange shippment within 15 days after getting deopsit,
but customized machines should be more than 25 days.
2.What you can do if my machines have problems?
1) We can send you free components to you if your machines are in guarantee time.
2) We can send our engineers to repair your machines
3.Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.
4. If I make Insulating glass, how many basic machines do i need?