Vertical Four Corner Welding Machine with CNC Operation for PVC Window Door
USD $8,680 - $26,865 /Set
Min.Order:1 Set
Haijinna CNC Machinery Co., Ltd.
Vertical Four Corner Welding Machine with CNC Operation for PVC Window Door
Detailed Information
Equipment Advantages
1. One working cycle,one frame,if with double layer,one working cycle,two frames.
2. Common profile fixture along with the machine can meet various height profiles' processing requirement.
3. Imported computer control system,for high precise welding,easy operation and high stability.
4. Two profile-clamps synchronously and symmetrically feeding forward to realize parallel welding.Increased corner strength.
Main Pharameter:
We work with everything from raw material to final machine, could guarantee machine quality from each step. select each part carefully, we are strive to quality first when machine production and test each machine before delivery.
We will provide the best machine for you.
1.Q:Are you a manufacturer?
A: Yes,we have been in providing the professional products in this field for 10 years.
2.Ask:how to install the machine ?
A:we can intrust the install the machine by vedio, email ,picture.....if large project , we can arrange the worker help you to install it in your country .
3.Q :How you pack the products ?
A: Normally as the export standard packaging or as you required.
4.Q: What is your available port of shipment?
A:Qingdao port,shanghai,tianjin,guangzhou etc.
5.Q: Is customized available ?
A: Yes, according to your detailed drawings you provide
7. Q:After Sale Service
24 hours technical support by phone, email or skype (email or skype) .
12 months warranty period
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the customer start the business smoothly, to realize win-win cooperation
8.Q: Are you trading company or manufacturer ?
A: We are factory and welcome to visit us at any time.
9.Q: How long is your delivery time?
A: Generally single tanks need 15-30 days, for whole plant need 30-50days.
10.Q: Do you have CE and UL certification?
A: Yes.