HW190L Crawler water well drilling rig/hydraulic geotechnical drilling rig/crawler core drilling machine for water well
USD $7,800 - $18,000 /Set
Min.Order:1 Set
1. The drilling machine adopts automatic telescopic rig, which is supported by two high-strength oil cylinders. A group of hydraulic valves control the rig's pitching. It is safe and reliable during operation and maximizes the benefits for users.
2. The chassis is made of rubber track, which is light in weight, can reduce the noise of the vehicle's running mechanism, reduce the vibration of the car body and greatly reduce the fuel consumption. It can walk on urban roads without hurting the road.
3. The chassis comes with hydraulic high-legs, which can be used for leveling and loading and unloading of drilling rigs, and can be used as auxiliary support during work.
4. Using 24v electric start diesel engine to reduce the labor intensity of the operator, especially in the cold winter, when the diesel start is difficult, the superiority is demonstrated.
5. This machine is equipped with BW-60 mud pump. The pump flow and pressure are large, the maintenance is convenient, and the spare parts are easy to purchase.
6. Hydraulic pipe twisting machine (75-168mm) can be installed to improve work efficiency and reduce labor cost.
7. Optional models are HW-160L/190L/230L
For the soil geology and hard rocky geology!
Your mechanical professional consultant -Zak
+whatsapp/Wechat: +8613665378318
Main parameter of crawler hydraulic drilling rig | ||||
Machine Specification | Model | HW160L | HW190L | HW230L |
Drilling depth(m) | 160 | 190 | 230 | |
Open hole dia.(mm) soil/rock | 500/220 | 500/220 | 500/273 | |
End hole dia.(mm) | 75 | 75 | 75 | |
Drill rod dia.(mm) | 42/50 | 42/50/60 | 42/50/60 | |
Drill angle(°) | 90-75 | 90-75 | 90-75 | |
Matching engine power(kw) | 13.2 | 13.2 | 15 | |
Weight without engine(kg) | 3350 | 3400 | 3600 | |
Dimension(L*W*H)(mm) | 3800*1950*2700 | 3800*1950*2700 | 3800*1950*2700 | |
Spindle | Speed(r/min) | 142/285/570 | 130/300/480/730/830/1045 | 64/128/287/557 |
Stroke(mm) | 450 | 450 | 450 | |
Crawler Chassis | Crawler size(mm) | 350*90*48 | 350*90*48 | 350*90*48 |
Climbing angle(°) | 20 | 20 | 20 | |
Moving speed(km/h) | 10 | 10 | 10 | |
Hydraulic landing leg valid height(mm) | 1300 | 1300 | 1300 | |
Drill Mast | Rated load(ton) | 18 | 18 | 18 |
Effective height(m) | 6.5 | 6.5 | 6.5 | |
Mud Pump | Flow(L/min) | 160 | 160 | 160 |
ure(Mpa) | 1.3 | 1.3 | 1.3 | |
Back and forth(times/min) | 165 | 165 | 165 | |
Inlet hose dia.(mm) | 51 | 51 | 51 | |
Outlet hose dia.(mm) | 32 | 32 | 32 |
BW-250 Mud pump +whatsapp/Wechat: +8613665378318
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: