200m Truck mounted hydraulic borehole drilling rig prices
Main feature:
1, XYC-200 car rig for multi-purpose hydraulic car vertical shaft rotary drilling rig.
2, the vehicle chassis Wuzheng three-wheeled car 7YP-1475D1, drilling rig drive system and winch, mud pump and other important accessories installed on the chassis, the layout is reasonable and compact, easy to operate.
3, equipped with BW-160 mud pump, high pressure, large flow, to ensure drilling depth and bore diameter.
4, drilling rig self-mobile device, you can achieve drilling rig back and forth before and after the host, easy to operate wellhead.
5, rig tower hydraulic landing type folding drill tower, safe and convenient operation.
Adaptation:
Geological Survey exploration, road and high-rise building foundation exploration, as well as a variety of concrete structure inspection holes, river embankments, roadbed grouting hole drilling and direct grouting, civil wells and ground temperature central air conditioning.
Technical Parameters | |||
Drilling depth(m) | 200 | ||
Drilling diameter(mm) | 325 | ||
Drilling inclination(°) | 75 | ||
Vertical axis speed(r/min) | 64/128/287/557 | ||
Vertical axis travel(mm) | 450 | ||
Main winch to enhance capacity (single rope)(Kg) | 1600 | ||
The main winch capacity rope(m) | 35 | ||
Reel lifting speed(r/s) | 17,35,75,151 | ||
Rope diameter(mm) | 12.5 | ||
Tower high(mm) | 7000 | ||
Drill tower effective height(mm) | 6500 | ||
Active drill pipe (mm) | 59*53 | ||
Drill pipe(mm) | 42,50,60 | ||
Rig weight(kg) | 3000 | ||
Engine | Model:ZS1115 diesel engine | ||
Rated power 14.7kw / 2200rpm | |||
BW-160 mud pump | Limited Data(L/min) | 160 | |
Preset pressure(Mpa) | 1.3 | ||
Driving power(kw) | 5.15 | ||
Host weight(kg) | 190 | ||
Dimensions(mm) | 1110*725*965 | ||
Car chassis | Model | Five levy three rounds of the car 7YP-1475D1 | |
Drive form | After the drive | ||
Engine | Model | Changchai ZS1115E2 | |
Emission Standards | GB18322-2002,GB19756-2005(Ⅱ) | ||
Rated power (KW) | 16.2 | ||
Rotating speed (r/min) | 2200 |
200m deep hydraulic borehole water well drilling rig
High Quality 200m Truck mounted hydraulic borehole drilling rig prices
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: