Solar Plant Ground Screw Pile Driver /Hydraulic Press Pile Driver
USD $24500.00 - $25500.00 /Set
Min.Order:1 Set
Hengwang CE 3 meter Solar pile screw pile ground drill crawler drilling machine
Hengwang CE HWL300 crawler solar pile ramming machine,solar screw pile,solar power energy screw pile
Hengwang CE 3 meter solar pile ramming machine,solar pile hole drilling rig,solar screw pile driver
Hengwang CE 3 Meter Sheet Pile Solar Drop Hammer For Pile Driving Machine
Solar Plant Ground Screw Pile Driver /Hydraulic Press Pile Driver
Pile driver speed,the average 1.5 minutes can realize piling 3 meters deep,namely a hole 1.5 minutes to play.Oil province,is a common driver uses around half of a year can be a driver left money for you.Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
Crawler walking,high walking and climbing ability The frame can be moved back and forth,bit can be adjusted , high piling position accuracy.
Specification of pile driver
Model | HZQX-300L Pile driver | |
Hammer Model | 390 | |
Effective press pile stroke | 0-4000 | mm |
Rotation angle | 360 | ° |
Rotation semi diameter | mm | 1925 |
Hydraulic system pressure | 22 | mpa |
Rated torque | 8000 | n.m |
Max torque | 11500 | n.m |
Duplex gear pump rated pressure | 20 | mpa |
Duplex gear pump max pressure | 25 | mpa |
Duplex gear pump displacement | 40 | ml/r |
Engine | 4108 | |
Diesel engine power | 80 | kw |
Engine speed | 3000 | r/min |
Track shoe | 350 | mm |
Walking motor total displacement | 1575 | ml/r |
Walking motor rated pressure | 18 | mpa |
Walking motor output torque | 4300 | n.m |
Walking motor rotate speed | 50 | r/min |
Dimension(LXWXH) | 4.2*2.1*2.9 | m |
Operating Speed (m/min) | 1.5 | 90s/per pile |
Number of impacts / strokes per 1 minute | 900 | times/min |
Walking speed | 5-10 | Km/hr |
Gradeability | 0-35 | ° |