Portable flood control pile driver (pile driver) HWK-200 is mainly used for construction pile foundation engineering and bridge engineering.
★ ★ ★ ★ The product has power source, exciter, and connect the power source, the shaker drive shaft composed of three parts. New structure, small size, light weight, easy operation, strong mobility, from the power supply environment. Not only can the vertical piling, but also oblique. Compared with manual piling, the labor intensity is low and the working efficiency is high. Instead of manual piling, the piling work of flood control is realized.
★ ★ ★ ★ portable flood control pile driver application areas: to intercept embankment breach, wave berm, grab high dike top, grab the embankment collapse, reinforcement embankment. Is a new type of special for flood season flood control, before and after the flood dike reinforcement maintenance, rivers and lakes embankment piling machinery. It not only replace the current manpower ramming the operation, reduce labor intensity of labor, improve the efficiency of piling, and the realization of the flood control piling mechanization.
Instructions:
1)the pile (piles and drill rod) vertical need to pile inserted in the pile on the ground.
2)with l ~ 2 people will be lifted pneumatic pile driver on the top of the pile, with the bottom of the three fixed-chuck Ding Luo fixed, locking the size of the pile to adjust the use of screws.
3) with rubber pipe and pneumatic pile driver and gas source is connected.
4) vertical support a good pile driver, the switch to the open position, pneumatic pile driver began to work.
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
QQ: 2851087478
Tel: +86-0537-2883128
Mob: +86-18853716028
Whatsapp:+8613371220022
Skype:hengwangfrank(at)
E-mail: hengwang02(at)