hydraulic solar pile driver hammer ramming machine for solar project
USD $19230.00 - $21149.00 /Set
Min.Order:1 Set
hydraulic solar pile driver hammer ramming machine for solar project
Pile driver speed,the average 1.5 minutes can realize piling 3 meters deep,namely a hole 1.5 minutes to play.Oil province,is a common driver uses around half of a year can be a driver left money for you.Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
Crawler walking,high walking and climbing ability The frame can be moved back and forth,bit can be adjusted , high piling position accuracy.
Specification of pile driver
Model | HZQX-300L Pile driver | ||
Hammer Model | 390 | ||
Effective press pile stroke | 0-4000 | mm | |
Rotation angle | 360 | ° | |
Rotation semi diameter | mm | 1925 | |
Hydraulic system pressure | 22 | mpa | |
Rated torque | 8000 | n.m | |
Max torque | 11500 | n.m | |
Duplex gear pump rated pressure | 20 | mpa | |
Duplex gear pump max pressure | 25 | mpa | |
Duplex gear pump displacement | 40 | ml/r | |
Engine | 4108 | ||
Diesel engine power | 80 | kw | |
Engine speed | 3000 | r/min | |
Track shoe | 350 | mm | |
Walking motor total displacement | 1575 | ml/r | |
Walking motor rated pressure | 18 | mpa | |
Walking motor output torque | 4300 | n.m | |
Walking motor rotate speed | 50 | r/min | |
Dimension(LXWXH) | 4.2*2.1*2.9 | m | |
Operating Speed (m/min) | 1.5 | 90s/per pile | |
Number of impacts / strokes per 1 minute | 900 | times/min | |
Walking speed | 5-10 | Km/hr | |
Gradeability | 0-35 | ° |
Contact: Nancy Wang
Skype:hw013 (at)
QQ:2853024693
Trade manger:cn1514430612ekdn
Whatsapp/Wechat/Mobile:+86-13625376308
Tel:+86-537-2882858
MOQ,Payment,Loading port,price term,OEM about pile driver
1.Payment : I:100% T/T
II:30% advaced and the balance paid before delivery
III:credit letter at sight
2.MOQ:1Pcs
3.Port of loading: Qingdao Port or others
4.Price term:FOB Qingdao price
5.OEM:we are pleased to be your OEM factory