MP-YT28 YT24, YT27 Pneumatic Hand held rock drilling machine
USD $300 - $340 /Set
Min.Order:1 Set
YT28 Rock Drill Feathures:
1.The rock drill is a kind of high efficiency air leg rock drill machinery.
2.It is mainly used for blasting holes and other drilling works in a quarries, railway construction, water conservancy construction and defence project facility.
3.It is suitable for drilling and blasting under various of rocks and any direction angles.
4.Blast hole dia is 34-42mm, drill hole depth is 5m.
5.This machine may match with FT160BD short air leg of FT160BC long air leg.
YT28 Rock Drill Application:
It is mainly used for diging into mine laneway and blasting holes in all drilling works. It is indispensably importance machine tool in metallurgy, coal, railway, traffic, water conservancy construction and national defence stone project.Blast hole dia is 34-42mm,drill hole depth is 5m. This machine may match with Model FT160 air leg.
Technical Parameter FOR YT28 ROCK DRILL | |
Type | YT28 |
Weight | 26 (Kg) |
Length | 661(mm) |
Cylinder dia | φ80 (mm) |
Piston stroke | 60 (mm) |
Working pressure | 0.4~0.5 (Mpa) |
Impact energy | ≥60.2 (J) |
Impact frequency | ≥37 (Hz) |
Air consumption | ≤81 (L/s) |
Working water pressure | 0.2~0.3 (Mpa) |
Air pipe inner dia | φ25 (mm) |
Water pipe inner dia | φ13 (mm) |
Rock drill hole dia | φ34~φ42 (mm) |
Rock drill hole depth | 5 (m) |
Shank size | 22×108 (mm) |
Name: Drill bits Brand: HWZG Original: China Tapered chisel bits/ Tapered cross bits/Tapered button bits, the diameters such as 32mm, 34mm,36mm, 38mm,40mm, 42mm. | |
Machine PartsName: Air Leg | |
Main FeaturesName: B22 Drill rod
| |
Machine PartsSome spare parts will send to you with the machine together,this just for free. |
Any question,please feel free to contact Kavin any time.
Email:hwzg004(AT)
Mobile/What's app/Wechat:+8618853717316
QQ: 2851087470
Fax: 0086-537-2585538
Electric Hammer | Gasoline rock drill | steel rebar cutting machine |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment <=10000USD, 100% in advance. Payment >=10000USD, 50% T/T in advance ,balance before shippment.