HENGWANG screw pile driver hydraulic best selling
USD $16,000 - $28,000 /Set
Min.Order:1 Set
Engineering construction Crawler Rotary Screw pile driver Application
The hydraulic pile driver is a kind of multifunctional highway guardrail pile construction machinery,
with different configuration it can accomplish many functions, such as piling, pile extracting,
and drilling on the stable layer of road before piling
Crawler walking,high walking and climbing ability .The frame can be moved back and forth,bit can
be adjusted,high piling position accuracy.
Engineering construction Crawler Rotary Screw pile driver Main Features
1) Pile driving speed,the average 3 minutes can realize piling 6 meters deep ,namely a hole
three minutes to play.
2) Oil province,is a common driver USES around half of a year can be driver left money for you.
3)Bit using manganese steel manufacturing ,through special processing,are suitable for all kinds
of geological environment.
4) Crowler walking ,walking and climbing ability.
5) the frame can be moved back forth around bit can be adjust ,piling positioning accuracy.
Engineering construction Crawler Rotary Screw pile driver Parameters
1 | Diesel engine power | 65kw |
2 | Walking motor torque (max) | 5700N.M |
3 | Rotary motor max torque(impact drill) | 2000-2500N.M |
4 | Rotary motor max torque(Auger drill) | 8000-10000N.M |
5 | Pile height (max) | 10m |
6 | Mast route | 3700mm |
8 | Drill diameters(impact drill) | 350-400mm |
9 | Drill depth(auger drill) | 8-10m |
11 | Drill angle(L/R) | 25/-90 ° |
12 | Drill angle(forward/backward) | 20/-20 ° |
13 | Hydraulic system pressure | 16Mpa |
14 | Hydraulic system flow | 90L/min |
15 | Travelling speed | 1.6Km/h |
16 | Chassis spec | 2500*2000*520mm |
17 | Track chassis height | 300mm |
18 | Track height above the ground | 230mm |
19 | Clambing ability: | ≤ 30° |
20 | Track working pressure | 13Mpa |
21 | Track rotation angle | 360° |
22 | Hydraulic hammer impact power | 6-8T |
23 | Dimension(L*W*H) | 4000*2000*6000mm (Working) |
24 | Dimension(L*W*H) | 6000*2000*2400mm (Folden) |
25 | Net weight | 6000kgs |
Engineering construction Crawler Rotary Screw pile driver Photos
Company culture | |
Core concept | Green development ,Harmony and win-win. |
Quality policy | Reliable navigation ,Specialization,Manufactureof precision,Service sincerity. |
Company spirit | Beyond, Create, Share. |
Criteria for partners | Frank, Trust, Fairness, Impartiality. |
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
KQD150 Air DTH water well bore hole drilling rig DTH portable borehole water well drilling machine rigs
If you have another question, pls feel free to contact us as below: