Factory Supply Shielded Control Cable Pvc Sheathed Braided Shied Flexible Flame Retardant Cables
Conditions:
Rated voltage Uo/U of cable is 450V/750V
Long-term working temperature of cable conductor is 70°C
Laying temperature is not less than 0°C
Bending radius of cable: not less than 6 times of the diameter of cable withour armoring layer; not less than 12 times of the diameter of cable with armoring or Cu-yupe shielding structure, not less than 6 times of the diemeter of soft cables with shielding structure.
Application:
This product is applicable to power lines with rated voltage of 1kV and below and 3KV and below.Suitable for laying in hotels, stations, chemical industry, oil platforms, mines, power stations, subways, tunnels, high-rise buildings, etc.
1. Long term working temperature for the cable with PVC insulated is 70℃;
Long term working temperature for the cable with XLPE insulated is 90℃
2. Short circuit temperature
For PVC insulated cable ,the highest conductor temperature is not more than160℃. (lasting time not over 5 seconds).
For XLPE insulated cable ,the highest conductor temperature is not more than250℃. (Lasting time is not over 5 seconds).
3. Laying temperature not less than 0℃ and the drop height is out of consideration.
4. The cable with chemical stability, anti- acid, anti-alkali, anti-oil, anti-organic solvent, not easy to be burning.
5. Easy for installation, easy bending and light.
Copper Conductor PVC insulated and sheathed control cable
For Laying indoors, in trenches and in ducts, For fixed installation
KVVP
Copper Conductor PVC Insulated &sheathed copper wire braiding screened control cable
KVVP2
Copper Conductor PVC insulated &sheathed control cable with copper tape shield
KVV22
Copper Conductor PVC insulated and sheathed control cable with steel tape armor
For laying indoors, in trenches, in ducts and in ground, able to withstand heavier mechanical force, and for fixed installation
KVVR
Copper Conductor PVC Insulated and sheathed flexible control cable
For laying indoors, movable and flexible
KVV32
Copper Conductor PVC insulated and sheathed control cable with steel wire armor
For laying indoors, in trenches, in ducts and in ground, able to withstand heavier mechanical force, and for fixed installation
ZR-KVVRP
Copper Conductor PVC insulated &sheathed copper wire braiding screened flexible control cable flame retardant
Fixed laying indoors with capability of moving and screening
ZR-KVV
Copper conductor PVC insulated and sheathed flame retardant control cable
For laying indoors, in trenches, in ducts, and for fixed installation. The cable should be flame retardant
ZR-KVVP2
Copper Conductor PVC insulated and sheathed flame retardant control cable with steel tape armor
ZR-KVV22
Copper Conductor PVC insulated &sheathed flame retardant control cable with steel tape armor
For laying indoors, in trenches, in ducts, and underground. The cable should be flame retardant and able to bear heavier mechanical force, and for fixed installation
ZR-KVVR
Copper conductor PVC insulated and sheathed flame retardant flexible control cable
For laying indoors, and the cable should be flame retardant flexible and movable.
ZR-KVV32
Copper Conductor PVC insulated and sheathed flame retardant control cable with steel wire armour
For laying indoors, in trenches, in ducts, and underground, the cable should be flame retardant and able to bear beaver extermal mechanical force, and for fixed installationce the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.
1. Q: Are you trading company or manufacturer ?
A: We are factory.2. Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
3. Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity.
4. Q: What is the regular shipping port?
A: Tianjin Port.
5. Q:What is your terms of payment ?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 50% T/T in advance, the balance should be paid before shippment.