0.6/1kV 4 Cores 5 Cores Power Cable 4mm 16mm Cu/Al Conductor PVC/XLPE Insulation PVC Outer Sheath
USD $0.25 - $1.50 /Meter
Min.Order:100 Meters
ZLRC Environmental Protection Equipment Co., Ltd.
This product is applicable to being fixedly laid on the transmission and distribution line of alternative current rating 50Hz and rated voltage up to 0.6/1.0Kv with the use for power transmission, which is applied to the range of distribution network, industrial equipments, etc.
This product is normal used cable, not suitable for some special situation, such as aerial, underwater, ship, sea, nuclear station, etc.
Specification:
1. NO.of Core: 2 3 4 5 3+1 3+2 4+1 5 etc.
2. Power Wire Rated voltage: 0.6~35KV
3. Nominal Cross-sectional area: 1.5~400mm2
4. Power Cable Test voltage(a.c): 3.5kv/5min
5. Standards: GB/12706 or IEC
6. Power Cable Application: Suitable for use in power distribution lines or fixed
7. Power Cable Operating Characteristics:
1).Max.permissible continuous operating temperature of conductor(PVC/XLPE): 70°C/90°C
2). Max.short-circuit temperature of conductor shall not exceed(5s maximum duration) XLPE:250°C
3). The ambient temperature under installation shall not be below 0°C
4). Bending radius:
A, Common bending radius:
a. ≥20D (1and 2cores)
b. ≥15D (3 cores)
c. ≥15D (2 cores with armor)
d. ≥12D (4,5,3+1,4+1,3+2 cores with armor)
D= outer diameter
B, Bending radius for the section which near the junction and connector:
a. ≥15D (1 and 2 cores)
b. ≥12D (3, 4,5,3+1,4+1,3+2 cores)
c. ≥12D (2 cores with armor)
d. ≥10D (3, 4, 5, 3+1,4+1,3+2 cores with armor)
Packaging Details
1. Q: Are you trading company or manufacturer ?
A: We are factory.
2. Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
3. Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity.
4. Q: What is the regular shipping port?
A: Tianjin Port.
5. Q:What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, the balance should be paid before shippment.