High Pressure and High Temperature alloy steel pipe
USD $942 - $2,940 /Ton
Min.Order:3 Tons
Tyne Metal Materials Co., Ltd.
1. | Item | High Pressure and High Temperature alloy steel pipe | |
2. | Standard | ASTM A213, ASTM A335, JIS G3462, JIS G3458, DIN17175, GB9948, GB 6479, etc. | |
3. | Material | P1, P2, P12, P11, P22, P5, P9, P91, P92,T1, T2, T11,T12, T5, T9,T22,ST52, X42, X46, X52, X60,X70,X80,X100, 15CrMo,Cr5Mo,10CrMo910,12Cr2Mo, 13CrMo44,12CrMo195,42CrMo,42CrMO4,x12CrMo91,12CrMo,etc. | |
4. | Specifications | Wall thickness | 1mm~120mm |
Outside diameter | 6mm~2500mm | ||
Length | 5.8m, 6m, 11.8m, 12m, or as required. | ||
5. | Surface | Black painted, PE coated, HDPE, Varnished, Galvanized, etc. | |
6. | Price Term | Ex-work, FOB, CIF, CFR, etc. | |
7. | Payment Term | T/T, L/C, Western Union. | |
8. | Export to | Singapore, Canada, Indonesia, Korea, USA, UK, Thailand, Peru, Saudi Arabia, Vietnam, Iran, India, Ukraine, Brazil, South Africa, etc. | |
9. | MOQ | 3000kg | |
10. | Delivery Time | Prompt delivery or as order's quantity. | |
11. | Package | Export standard package; bundled wooden box, suit for all kinds of transport, or be required |
Q: Are you a manufacturer or trading company?
A: We are a specialized manufacturer.
Q: How about the delivery terms?
A: 1. Payment: T/T, Western Union, Paypal, 30% deposit in advance and balance before delivery.
2. Min. Order Quantity: 100KG, or as required.
3. Transportation: By express (DHL,TNT,FedEx),air,sea,and train.
Q: How about discount?
A: Price is based on products and order quantity.
Q: Do you accept sample order?
A: Yes sure, please contact us for details.
Q: How about your after-sales service?
A: As a professional steel exporter, we offer promote technology support for all problems and questions.
Besides, we accept goods return or replace for quality problem.
Q: How does your company control the quality?
A: Quality first. In order to guarantee high quality for our products,
Modern always makes a serious inspection for all products and raw materials in strict procedure.