high quality 3pe coated api5l x52 x70 seamless l360(x52) c steel pipe spiral
USD $500 - $800 /Ton
Min.Order:1 Ton
Product Name | Double-faced Spiral Arc Merged Welded Steel Pipe | |||
Size | OD | 159--3020mm in Theory | ||
Thickness | 4--25mm in Theory | |||
Length | Usually 6~12 Meters, 20 Meters Max in Theory | |||
Standard | SY/T5037 SY/T5040 GB/T9711 API5L EN10208 ASTM A252 JISA5525 | |||
Material | Chinese Grade | Q235,Q345,S245,S290,S320,S360,S390,S415,S450 | ||
Foreign Grade | ASTM | Grade A,Grade B,X42,X46,X52,X56,X60,X65,X70 | ||
EN | S185,S235JR,S235JO,E335,S355JR,S355JO L245,L290,L320,L360,L390,L415,L450 | |||
Usage | Used For Water, Sewage, Gas, Stream, Combustible Fluids(Petroleum and Gas) | |||
Ends | Beveled (Can be Protected By Plastic Caps or Steel Rings According to Your Requirements)Also We Can Weld Flanges on the Pipe Ends Plain Ends | |||
Surface | Bared Or Paint With Oil, Bitumen,1-3 layer PE | |||
Inspection | With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection, Also With Nondestructive Inspection | |||
Technique | Hot Rolled and SSAW or DSAW | |||
Package | Package With Steel Strip When O.D≤273MM, Otherwise In Bulk. | |||
Date of Delivery | According to The Specifications And the Quantities, Time Begin When We confirm the Date of the Earnest or L/C | |||
Method of Payment | T/T L/C West Union | |||
Method Of Delivery | Terms According To the for International Trading, | |||
Others | N/A |
Details Showing
Hot Dip Glavanized
3PE Treatment For Underground Usage
Standard Sea Worthy Package For Ant-Rust During The Delivery
Quality Control & BV Test
Loading
Packing: 1) only in bundles by steel scrips 2) in bundles and in plastic wrap 3) in bulk
4) conform to client' s requirements
Loading port: Tianjin,China.
Shipment:usual length ≤5.8m by 20'GP,6m-12m by 40'GP(some sizes with 6m L can be into 20'GP).
Company Profile
We are manufacturer and professional supplier in all kinds of steel pipe in Tianjin Daqiuzhuang mre than 14 years and 8 years Gold Supplier on Alibaba. And also we have good business relationship with customers from India, Philippines, Maldives, Canada, etc.
Business Partners and Our Team
Q1:How about thequality?
A:Third party inspections are always welcomed. Like BV, SGS etc.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD or
design drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting,coating,pipe cutting, etc.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.