galvanized ms rectangular hollow section rectangular steel pipes size steel weld square hollow section
USD $500 - $700 /Metric Ton
Min.Order:1 Metric Ton
50*50 square pipe thin wall slightly oiled rhs steel tube square hollow section 40mm
thin wall steel square tubing erw black steel tube small size rectangular pipe
steel for table best selling in thailand welded square gi galvanized rectangular pipe 60x80
rectangular hollow section greenhouse pre-galvanized steel pipe china supplier mild steel pipe
weight ms and steel pipe thick wall square 2 1/2""x3"" rectangular tube galvanized
form hollow section hot dipped galvanize tube galvanized square pipe 18x18
Product Name | Square Steel Pipe | |
Size | OD | 20~3020mm In Theory |
Thickness | 1.0~32mm | |
Length | Any Length Below 16 Meter | |
Standard | API 5L | |
Material | Grade B,X42,X46,X52,X56,X60,X65,X70,etc | |
Usage | PSL-1 Class IS 100% Qualified To Petroleum And Gas Industry, PSL-2 Can Be Used In Refinery And Chemical Plant | |
Ends | Plain, Beveled, Or Weld With Flanges Plastic Caps And Steel Rings Can Be Provided If Possible | |
Surface | Bared, Galvanized, Oiled, Color Paint, 3PE; Or Other Anti-corrosive Treatment | |
Inspection | With Chemical Composition and Mechanical Properties Analysis; Hydrostatic Test, Dimensional and Visual Inspection, Also With Nondestructive Inspection | |
Technique | Hot Rolled Or Cold Rolled ERW | |
Package | Hexagon Shape Package, Covered With Tarpaulin Or Plastic, Containers Or In Bulk | |
Date of Delivery | According to The Specifications And the Quantities Of Each Contract, Time Start To Begin When We confirm the Date of the Earnest or L/C | |
Method of Payment | T/T L/C West Union | |
Method Of Delivery | Terms According To the <INCOTERMS 2000> for International Trading, | |
Others | N/A |
professional supplier of all kinds of steel pipes
more than 13 years experience
7 years gold supplier on alibaba
2.Details of the pipe
3.Glavanized
4.Powder Coated
5.Cutting into required length
6.Standard Sea Worthy Package For Ant-Rust During The Delivery
7.Loading into containers
8.Company certificate