2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material
2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material
2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material
2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material
2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material
2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

USD $620 - $850 /Ton

Min.Order:1 Ton

Supply Ability:
5000 Ton / Tons per Month
Port:
Tianjin port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Tianjin, China
Certification:
API
Thickness:
0.8, 12
Application:
Fluid Pipe
Technique:
ERW
Alloy Or Not:
Non-alloy

Sino Metal Material Co., Ltd

Business Type: Government ministry/Bureau/Commission
Main Products: Steel Pipe , , ,

Product Details

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

PRODUCT DISCRIPTION

 

Product Name:

ERW steel pipe/Welded Pipe/Steel Pipe/Welded steel pipe pile/carbon steel tubing

Size:

OD

1/2-10"

Wall Thickness

0.8-12mm

Length

Less Than 12m

Steel material

Q195 → Grade B, SS330,SPHC, S185

Q215 → Grade C,CS Type B,SS330, SPHC

Q235 → Grade D,SS400,S235JR,S235JO,S235J2

Standard

BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,BSEN10217,GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88

Usage

Used For Structure, Accessorize And Construction

Ends

1) Plain

2) Beveled

3) Thread

End protector

1) Plastic pipe cap

2) Iron protector

Surface Treatment

1) Bared

2) Black Painted (varnish coating)

3) Galvanized

4) With Oiled

5) 3 PE, FBE

Technique

Electronic Resistance Welded (ERW )

Electronic Fusion Welded (EFW)

Double Submerged Arc Welded (DSAW)

Type

Welded

Welded Line Type

Longitudinal

Section Shape

Round

Inspection

With Hydraulic Testing, Eddy Current , Infrared Test

Package

1) Bundle,

2) In Bulk

3) Bags

4) Clients' Requirements

Delivery

1) Container

2) Bulk carrier

Port of Shipment

Xingang, China

Date of Delivery

According To The Quantity And Specification Of Each Order

Payment

L/C T/T Western Union

Others

Fitting as screws and flange also can be supplied.

 

MATERIAL

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

SPECIFICATION

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

DETAILS SHOWING

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

PRODUCTION LINE

 

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

 

TESTING & CERTIFICATES

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

PACKING LOADING AND DELIVERY

Packing: 1) only in bundles by steel scrips
2) in bundles and in plastic wrap
3) in bulk
4) conform to client' s requirements
Loading port: Xingang Port Tianjin,China.
Shipment: usual length ≤5.8m by 20'GP,6m-12m by 40'GP(some sizes with 6m L can be into 20'GP).

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

INFORMATION ABOUT OUR COMPANY

SINO METAL MATERIAL CO.,LTD, is specialized in manufacturing steel pipes for 14 years,

and many special service can be done for you. such as ends treatment, surface finihsed,

with fittings, loading all kinds of sizes'goods in container together, and so on.
Our office is located in Nankai distric, Tianjin city, near Beijing, the capital of China,

and with excellent location.
It just takes 2 hours from Beijing international airport to our company by high speed rail.
And the goods can be deliveryed from our factory to tinajin port within 2 hours.

You can take 40 minutes from our office to Tianjin Binhai international airport by subway.

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

CONTACT US

If you are interested in our Steel Pipe ( Black steel pipe/ Galvanized steel pipe/Spiral steel pipe/

Square or rectangular steel pipe and Galvanized ones) ,please feel free to contact us.

Your any request will get prompt reply .

We are looking forward to cooperating with you.

2017 Alibaba Trade Assurance Custom-Produced ERW carbon steel pipes/round scaffolding material

Contact Supplier

Mobile
12111412286

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~