Solid Adjustable Base Jack
USD $3 - $5 /Ton
Min.Order:25 Tons
Gainford Construction Materials (DongGuan) Limited
4.Maintenance free.
A: One full container
A: Packed into bundle, and rest in bulk.
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
A: 10-20 days after received the advance payment or L/C.
A: We are the munafacturer of scaffolding matetials for years, coveraged every scaffolding systems.
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack