Product Details

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

Brand Name JN
Place of Origin Shandong, China
Type Hydraulic Power Units

Product Features

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

Product Description
 

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

1. Descriptions of Hydraulic Cylinder Piston Rod With Chrome Plated

Size: Ø 6-360mm
Length: 3m -9m 
Material:CK45/ ST52/ 20MnV6/ 42CrMo4/ SAE1045/SAE10V45
ToleranceISO f7 
Chrome thickness:20~30micron
Hardness of  the chrome layer: 800HV(min)
Roughness: Ra0.2micron (max)
Straightness: 0.2/1000mm
Yield Strength≥350 Mpa   
Tensile Strength≥580 Mpa  
Elongation≥ 15%
Supply condition:1.Hard chrome plated
2.Induction hardened
3.Quenched & Tempered
4.Induction hardened with Q&T

 

Product's Technical

2. Chemical Composition

MaterialC%Mn%Si%S%P%V%Cr%
Ck450.42-0.500.50-0.800.17-0.37≤0.035≤0.035  ≤0.25
ST52≤0.22≤1.6≤0.55≤0.04≤0.04   0.02-0.15 
20MnV60.17-0.241.30-1.700.10-0.50≤0.035≤0.0350.10-0.20       ≤0.30
42CrMo40.38-0.450.50-0.800.17-0.37≤0.035≤0.035   0.07-0.120.90-1.20
40Cr0.37-0.450.50-0.800.17-0.37≤0.035  ≤0.035 0.80-1.10

3. Mechancial Properties

MaterialT.S  N/MM2Y.S  N/MM2E%(MIN)CHARPYCONDITION
CK4561035515>41JNORMALIZE
CK4580063020>41JQ + T
ST5250035522 NORMALIZE
20MnV675059012>40JNORMALIZE
42CrMo498085014>47JQ + T
40Cr100080010 Q + T

 

4.SAE10V45Micro Alloy steel:

OD

(MM)

T.S

MPA

Y.S

MPA

A%Z%KU2(J)HBW
40-100750-900520(MIN)194039230-290
100-140750-900520(MIN)173539230-290

5.Chrome rod delivery condition:

hard chrome plated piston rod (chrome plated rod Hard)

Quenched & Tempered chrome rod

Induction hardened chrome rod

Induction hardened rod with Q&T

 

6.Corrosion Resistance:

Min 120 hours NSS Rating 9 test according to ISO 9227 and ISO 10289 for the evaluation of the results.

Induction Hardeness50-55HRC
Induction Layer1.7-2.5mm

7.Detect picture

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

8. More Products to Choose

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

                                    >>Honed tube                                             >>Piston rod

9. Advantage of Product

1)Professional & skilled, reliable.
2)One-stop total solution
3)ready stock goods with fast delivery
4)Customizable: Non-standard sizes are also available
5)Small quantity is acceptable
6)Cash back: Refund or replacement for any product faulty

 

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

10.Quality measurement system

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

11. Applications of Product

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

12. Factory and Packaging of Product

Company Information

 42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

1. Introduction of Company      

      JIANNING METALS GROUP was established in 2001, With more than 10 years import and export experiences Jianning Metals has been an influential exporter in the global metal products market. More than 160 customers from 26 countries and regions have established long-term business relationships with us.

      Our main business range is listed as follows:

      Carbon Seamless Steel pipe/tube

      Hydraulic cylinder tube(Honed tube)

      Hard chrome plated rod/bar/shaft(Piston rod)

      We sincerely welcome friends from all over the world contact us to establish mutually beneficial business relationships

2. Our Company View

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

3. Our Customers

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

FAQ

 1.Q: How many days of your delivery?

   A:  The general delivery is 30~50 days according to your quantity.

 

2.Q: What's your main market?

   A: We mainly export to Middle East and South Eastern Asia. And this year our products enter into South America.

 

3.Q :Are you factory?

    A:Yeah, we are.

 

4.Q :Which countries do you export to?

   A: America, India, Korea, Pakistan, Turkey, Iran and so on.

 

5.Q :What is the delivery time?

   A: If we have stock, we can send goods within 20days. If not, we will delivery goods within 30-45days

 

6.Q: What is your main payment itme?

   A: T/T and L/C

 4.Contact us                                                                             

 

42CrMo4 CK45 Hard Chrome Plated Steel Bar Shaft Hydraulic Piston Rod

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now