Hot Rolled Structural Mild Seamless Carbon Steel Pipe
USD $596 - $676 /Ton
Min.Order:2 Tons
OD (MM) | Thinckness (MM) | OD (MM) | Thinckness (MM) | OD (MM) | Thinckness (MM) | OD (MM) | Thinckness (MM) |
21.3 | 1.5 | 26.8 | 1.5 | 33.5 | 1.6 | 42.3 | 1.5 |
1.8 | 1.6 | 1.8 | 1.8 | ||||
2 | 1.8 | 2 | 2 | ||||
2.1 | 2 | 2.3 | 2.3 | ||||
2.3 | 2.2 | 2.5 | 2.5 | ||||
2.5 | 2.3 | 2.75 | 2.75 | ||||
2.75 | 2.5 | 3 | 3 | ||||
48 | 1.8 | 2.75 | 3.25 | 3.25 | |||
2 | 60 | 1.8 | 75.5 | 2 | 88.5 | 2 | |
2.3 | 2 | 2.3 | 2.2 | ||||
2.4 | 2.3 | 2.5 | 2.5 | ||||
2.5 | 2.5 | 2.75 | 2.75 | ||||
2.75 | 2.75 | 3 | 3 | ||||
3 | 3 | 3.25 | 3.25 | ||||
3.25 | 3.25 | 3.5 | 3.5 | ||||
3.5 | 3.5 | 3.75 | 3.75 | ||||
114 | 2.1 | 140 | 2.5 | 165 | 2.5 | 4 | |
2.3 | 2.75 | 2.75 | 219 | 3.5 | |||
2.5 | 3 | 3 | 3.75 | ||||
2.75 | 3.25 | 3.1 | 4 | ||||
3 | 3.5 | 3.25 | 4.25 | ||||
3.25 | 3.75 | 3.5 | 4.5 | ||||
3.5 | 4 | 3.75 | 4.75 | ||||
3.75 | 4.25 | 4 | 5 | ||||
4 | 4.50 | 4.25 | 5.25 | ||||
4.50 | 5.5 | ||||||
5.75 | |||||||
6 |
Seamless Carbon Steel Pipe
SHANGHAI YONGZHOU INDUSTRY CO., LTD. located in ShangHai city, which is a steel enterprise focusing on both domestic and international trade. We have established long-term and win-win partnership with many large steel manufacturers, such as HBIS ,Jinxi Iron & Steel Co., Ltd. , Baoshan Iron & Steel Co., Ltd. , Anshan Iron & Steel Co., Ltd. and so on.
1,How to get an accurate quotation?
Product detail size & Length.
Product quantities.
Product Material grade.
2,How to contact with us?
Trade manager online,chat with me directly.
Send an inquiry to us.
Add our Skype account: yongzhou.steel
Make a call to us: +86-21-5769-7768 or +86-18516253329.
Send an Fax to us: +86-21-5769-7768.
3,What other items from this supplier?
Angle line structural steel, H beam, I beam, Channel.
Square, rectangular, round hollow section pipe.
Steel plate ,checker plate, corrugated sheet, steel coil.
Flat, square, round bar.
Screw, Stud bolt,bolt,nut,washer, flange and other related pipe kits, etc.
4,Maybe you will concern:
Payment Terms: T/T, L/C.
Terms of Trade: FOB, CFR, CIF, DDP, EXW, DAP.
Lead Time: Within 15-20 working days.(Fast delivery time cause the large stock size and rich experience in the field)