Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)
Spiral Pipes (With hydraulic testing etc)

Spiral Pipes (With hydraulic testing etc)

USD $650 - $900 /Ton

Min.Order:5 Tons

Supply Ability:
3000 Ton / Tons per Month
Port:
Tianjin Port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
China
Certification:
API
Thickness:
3, 50
Application:
Fluid Pipe
Technique:
SAW
Alloy Or Not:
Is Alloy

Tianjin Fangya International Co., Ltd.

Business Type: Agent
Main Products: Steel Pipe

Product Details

Product Description
Detailed Images


Why choose us


NO.1 Good Quality


NO.2 Reasonable Price

 NO.3 Fast Delivery

 NO.4 Professional Service

Packing & Delivery
                                   
                                     packing
when each plate weight is under 1 ton, it will be in bundle with steel strips 2-4, when each plate weight is over 1ton, it will be piece by piece.
20 feet container contains dimension
Width under 2300mm, length under 6000mm
40 feet container contains dimension
Width under 2300mm, length under 12000mm
By bulk vessel
Freight charge is low by bulk cargo, and large heavy sizes can not be loaded into containers can shipping by bulk cargo
Steel pipes material
Our Company

Company Information

Tianjin Emerson Commercial and Trade Co.,Ltdhas large stocks for the carbon steel and low alloy steel plates and sheets, especially have the thick plate and heavy plates on stock, also can provide the special material and large size steel plates, boiler and pressure vessel steel plate, marine steel plate, hot rolled steel plate for new production.Tianjin Emerson Commercial and Trade Co.,Ltdalso has large stock for hollow bars, thick wall seamless pipes and tubes.Tianjin Emerson Commercial and Trade Co.,Ltdcan provide good service for customer, good quality products, fast delivery, and after-sale service,Tianjin Emerson hopes to build good cooperation with everyone interested.

Production process
FAQ

1.How long can make delivery?

For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.

2. Will the Test Certificate be certified to EN10204 3.1?

For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.


3. Once the received products found not comply with the products the contract demands, what will you do?


Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.

Contact us

Contact Supplier

Mobile
12988737258

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~