Ms Steel Pipe! Aisi 4140 Steel Pipe En39 Bs1139 Scaffolding Tube
Ms Steel Pipe! Aisi 4140 Steel Pipe En39 Bs1139 Scaffolding Tube
Ms Steel Pipe! Aisi 4140 Steel Pipe En39 Bs1139 Scaffolding Tube
Ms Steel Pipe! Aisi 4140 Steel Pipe En39 Bs1139 Scaffolding Tube

Ms Steel Pipe! Aisi 4140 Steel Pipe En39 Bs1139 Scaffolding Tube

USD $500 - $600 /Ton

Min.Order:25 Tons

Supply Ability:
20000 Ton / Tons per Month
Port:
Xingang China
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Tianjin, China
Certification:
CE
Thickness:
0.8, 22
Application:
Structure Pipe
Surface Treatment:
Galvanized
Technique:
Cold Rolled

Haoyu Technology Development Co., Ltd.

Business Type: Other
Main Products: Steel , , ,

Product Details

Product Description

Commodity: Galvanized Scaffolding Steel Tube 


Outer Diameter: 1/2inch -- 12inch 


Wall Thickness: 0.8mm - 22mm 


Length: 5.8/6m or Customized 


Surface: Galvanized 


Zinc Coating: 200-650 G/M2 


Producing Standard: BS1387, En39, BS1139, En10219, En10255, ASTM A53 


Producing Technique: Galvanized, Welded 


Brand: DHFY


Pipe Usage: Scaffolding, Construction, Water Used, Building 


Trademark: DFHY


Transport Package: PVC Package 


Origin: China 


HS Code: 7306309000 

Productivity: 20000Ton/Month

Processing Technology available: Threading, Coupling and with plastic caps protected

Remarks: Payment T/T L/C

Trade Terms :FOB/CFR/CIF

MOQ: 25MT(25, 000KGS)

Delivery Period:25days


Detailed Images
Packing & Delivery
Our Company
FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order. 


Contact Supplier

Mobile
12375064153

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~