Item | Engine Steel value Rod for Engine |
Material | 304,304L,309S,310S,316,316L,316Ti,321,347,405,410,410,420,430, 201,202 |
Standard | ASTMA276,A479,A582,GB4226-84,GB/T1220-2007,JISG4311-91, JISG4318-98,EN10095-99,GB4226-84,EN10088-3-2005,JISG4303-2005 |
Model No. | 304,0Cr18Ni9,EN1.4301,SUS304,TP304 |
Type | Shaft,Flat,Square,Angle,Round |
Surface | Bright,pickling,polishing,sand blast,hair line,black,etc |
Round | 4mm-800mm |
Square | 4mm*4mm-500mm*500mm |
Flat | Thick:1mm-50mm |
Size:1mm*10mm-50mm*500mm | |
Angle | Thickness:1mm-150mm |
Width:5mm*5mm-800mm*800mm | |
Length:3m,4m,5.8m,6m,or as required | |
Trade terms | Payment of terms:T/T,L/C,western union |
Price terms:FOB,CFR,CIF,Ex-work | |
Application | Applies to petroleum,chemical industry,electric power,boiler,corrosion resistant.high temperature resistant,low temperature resistant. Stainless steel angle bar also can be made accroding to the buyer's required |
Package | Standard export seaworthy package or as required. |
Quality control | Mill Test Certification is supplied with shipment,Third Part Inspection is acceptable. |
Export to | Ireland,Singapore,Indonesia,Ukraine,Saudi Arabia,Spain,Canada,USA, razil,Thailand,Korea,Italy,India,Egypt,Oman,Malaysia,Kuwait,Canada, Peru,Mexico,Dubai, Russia,etc |
Delivery time | Prompt delivery or as the order quantity. |
Container size | 20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High) 24-26CBM 40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) 54CBM 40ft HC:12032mm(Length)x2352mm(Width)x2698mm(High) 68CBM |
Contact | If you have any question,please feel free to contact me. |
Packaging Details: | Standard seaworthy package (wooden boxes package,pvc package, and other package) |
---|---|
Delivery Detail: | Shipped in 3 days after payment |
Price term:CIF,CFR,FOB,CNF,Ex-work
Payment term:T/T,L/C,Western Union
Delivery time:
1.The products in stock will delivery immediately received the payment.
2.According to the order quantity,prompt delivery
Quality control:
Mill Test Certification is supplied with shipment, Third Part Inspection is acceptable.
transaction
Last Update Time:2017-09-14