Hot work Forging 1.2344 / H13 / SKD61 tool steel
USD $1 - $4 /Kilogram
Min.Order:1000 Kilograms
Mould Steel/High-Speed Steel | |
Grade(USA) | H13, D3, O1, D2, S7, A2, D6, P20, 420, 420S, P20HH, P20+NI, 420 MOD, P21, M2, M35, M42. |
Shape | Round Square Flat |
Standard | ASTM AMSE YB HB BJB GB etc |
Length | As Required |
Surface | Black or Bright |
Manufacture Technology | Hot rolled or Forged |
Package | wooden boxes package,pvc package, and other package |
Cold Working Tool Steel | ||||||
Grade | Description | AISI | JIS | EN | DIN | GB |
DC53 | High Carbon High Chrome Steel | D2 | SKD11 | XW-5 |
| Cr12Mo1V1 |
D3 | Cold Work Mould Steel | D3 |
| K100 |
| Cr12 |
D2 | Cold Work Mould Steel | D2 | SKD11/SLD | XW-41 | 1.2379 | Cr12Mo1V1 |
Cr12MoV | Cold Work Mould Steel |
|
|
|
| Cr12MoV |
O1 | Oil Mould Steel | O1 | SK3/SK4 | DF-2 | 1.2510 | 9CrWMn |
3Cr2W8V |
|
|
|
|
| 3Cr2W8V |
Plastic Mould Steel | ||||||
P20 | Plastic Mould Steel | P20 | HPM7/PX88 | 618 | 1.2311 | 3Cr2Mo |
718 | Plastic Mould Steel | P20+Ni | PX4/PX5 | 718 | 1.2738 | 3Cr2NiMo |
S136 | Plastic Mould Steel | 420 | S-STAR | S136 | 1.2083 | 4Cr13 |
NAK80 | Plastic Mould Steel | P21 | NAK80 |
|
| 15Ni3Mn |
Hot Working Tool Steel | ||||||
H13 | Hot Working Mould Steel | H13 | SKD61/DAC | 8407 | 1.2344/1.2343 | 4Cr5MoSiV1 |
FDAC | Hot Working Mould Steel |
| FDAC |
| 1.2347 |
|
H11 | Hot Working Mould Steel | H11 | SKD6 |
| 1.2343 |
|
High-Speed Steel | ||||||
M2 | High-Speed Steel | M2 | SKH51 |
|
| W6Mo5Cr4V2 |
M42 | High-Speed Steel | M42 | SKH59 |
|
| W2Mo9Cr4VCo8 |
Q1: How many countries you already exported?
A1: Exported to more than 30 countries mainly from America, Russia, UK, Kuwait, Egypt, Iran, Turkey, Jordan, etc.
Q2: How can I get some samples?
A2: Small samples in the store and can provide the samples for free. The catalog is available, most patterns we have ready samples in stock. Customized samples will take about 5-7days.
Q3: Do you have any MOQ limit for Steel products order?
A3: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping was also optional. For mass products, ship freight is preferred.
Q5: How does your company do regarding quality control?
A5: Mill Test Certificate is supplied with the shipment. If needed, a Third Party Inspection is acceptable or SGS.
Q6:Is it OK to print my logo on products??
A7: Yes. OEM and ODM are available for us.
We sincerely welcome you to our company to have a visit!