2017 Galvanized Steel Scaffolding Round Pipe used for Construction
USD $550 - $700 /Ton
Min.Order:25 Tons
Shisheng Scaffolding & Formwork Co., Ltd.
Item Name | Hot Dipped Galvanized Steel Pipe | |
Steel Material | Q195 → Grade B, SS330,SPHC, S185 St42, St45, A369 | |
Outer Diameter | round pipe: 20-219mm square pipe:20*20--200*200mm, 25*25-250*250mm, 30*30--250*250mm, 32*32-300*300mm, etc | |
Wall Thickness | 0.5mm-20mm | |
Length | 5.8m, 6m, max12m, or as customer's request. | |
Zinc Coating | 80-550g/m2 | |
Certification | SGS, ISO | |
Standard | ASTM A53, BS EN 10296-2006, BS EN10219, BS1139, JIS G3444-2006, JIS G3445-2006 API,GB,ASTM,BS1387-1985, ASTM-A53A, GB/T3091-2001 | |
Grade | Q195,Q215,Q235,Q345(These are 'chinese material',dear client, you need to tell me the material you need, then I can check them for you.) | |
Appliocation | construction, pipe of industrial,water pipe, plastic-steel doors and windows, fence equipment, telecommunication tubes and greenhouse etc. | |
Shape | round/ square/ rectangular | |
Surface Treatment | galvanized/ painted/ anti-rust oil ( or as customer's request) | |
Terms of Payment | L/C, T/T | |
Delivery time | 3-4 weeks after deposit | |
Type | welded or seamless | |
Output | 10000tons/month |
Application:
Our galvanized steel pipes are widely used in all fields, such as bridge, greenhouse,park fence post and other construction field.
Package:
Normal Packing:In Bundles or In Bulks or waterproof package
Special Packing:Plastic End or Knitting Bags or Packing according
to customers' requirements.
Pipe End:PlainBeveledThread with Coupling or cap.
Shipment:
a. length:≤5.8m loaded in 20FT Container with 25-27tons
b.length:≤11.8m loaded in 40FT Container with 25-27tons
Trade Terms: FOB / CIF / CFR
Payment Terms: LC TT
Loading Port: Xingang Tianjin,China
Delivery: 3-4 weeks after received deposit
We can produce special specification of the galvanized steel pipe products according to your requirement.
Since 2001, we has been specialized in manufacturing scaffolding props, scaffolding pipes, kwik stage/ringlock/cuplock/frame scaffoldings, steel planks, steel formwork parts,couplers and accessories. We have more than 16 years of production and export experience. All of our products comply with international quality standards and are greatly appreciated in a variety of markets around the world.
We have a highly experienced producing team, which maintains top level of every stage of the producing progress. Each team of workers is led by supervisor who monitors day to day works. Automated welding systems are widely used.
Today, we have customers in over 35 countries around the world. Our products are engineered for safety, strength and flexibility to meet international standards within this industry. It is important for structural engineers, scaffolding factories and formwork specialists. In terms of working processes, we have expertise in iron casting, steel forging and thread rolling. We have a complete quality control system, which guarantees the high quality of our products and makes sure all progress is made to schedule.
With all our technical knowledge and capacity, if you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients in the near future.
1. Are you a trader or manufacturer?
Manufacturer with an exporting office.
2. What's your payment terms?
TT, L/C at sight 100%, Trade Assurance.
3. What's your MOQ?
A full 20ft container.
4. What's your relative products?
Scaffolding and formwork products(Steel Prop, Steel Plank, Steel Pipe, Scaffolding Frame, Steel Formwork, Euro Formwork, Ringlock, Cuplock Scaffolding and accessories)
5. What's your history?
Our factory founded over 16 years, with more than 5 years exporting experience.
6. How about your after-sale service?
With professional team 7days and 24hours service to solve customer queries.
7. What's your main market?
Europe,Australia, South Asia, South America, Africa, Middle East etc.
8. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 3-4weeks if the goods are not in stock, it is according to quantity.
9. Could we visit your factory?
Warmly welcome visit our factory at any time, will arrange the professional team to follow up.
Business Manager: Amy Zhao
Tel:+86 (22) 83973806
Fax:+86(22) 83973806
Email: amy(@)
Skype: amyfighting3
Facebook: /amy.zhao.37853734
Tianjin Shisheng Scaffolding & Formwork Group – China Operation
Welcome visit our factory at any time!