Tianjin SS Group Quick Assembly Steel Formwork/ Shuttering / Template System To Replace H20 Timber Beam
USD $26 - $40 /Square Meter
Min.Order:500 Square Meters
Shisheng Scaffolding & Formwork Co., Ltd.
Tianjin SS Group Concrete Columns Formwork / Construction Steel Formwork
MF-077 High Grade Slab Formwork Panel For Concrete Formwork System
MF-031 Best Price Wall Concrete Metal Formwork For Construction Materials
SS-014 Tianjin Shisheng Schedule Scaffolding Pre-galvanzied Schedule 40 Steel Pipe
Tianjin Shisheng Construction Scaffolding Galvanized Steel Tube
SS-004 Steel Structure Building Material Welded 4'' Tube For Construction
Details of Concrete Metal Formwork/Steel Formwork
1.Concrete metal formwork is made of Q235 steel plate which is heavy/light duty formwork system for concrete wall, beam, slab and column.
2.There are some ribs in the middle of metal formwork which can strengthen the formwork more steady.
3.Coined edge can help to form a perfect concrete finish without bubbles.
4.Metal formwork is spray painted to against rustiness which can be reusable for many times.
5.Metal formwork is the all-round panel for many construction areas.
Usage
Ideal for all big and small construction sites’ requirements
Metal Formwork Features:
Strong build : to support heavy weight and high quality finish
compatible : compatible to suit any flat surface architectural and structural features
Reusable: can be re used up to 300 times
Recyclable : can be 100% recyclable
1. OEM Manufacturing welcomed: For example: Product, Package etc.
2. Sample order is allowed.
3. We will reply your inquiry within 24 hours.
4. After delivery, we will following the products for you when it can arrived your port and inform you in advance, until you get the products.
5.When you got the goods, if any problems please give us a feedback. We will offer the solve way for you.
Our Other Main Products as follows and click the links, thanks:
1. Steel Prop/Acrow Prp/Jack: https://shishenggroup.en.china.cn/productgrouplist-801838643/steel_props.html
2. Scaffolding Plank/Metal Deck: https://shishenggroup.en.china.cn/productgrouplist-801977511/steel_decking.html
3. Steel Scaffolding Frame: https://shishenggroup.en.china.cn/productgrouplist-801976312/Scaffolding.html
4. Steel Pipe/ GI Pipe/ Scaffolding Pipe: https://shishenggroup.en.china.cn/productgrouplist-801979106/steel_pipes.html
5. Scaffolding Coupler: https://shishenggroup.en.china.cn/productgrouplist-803571587/Couplers.html
Q1. What is your terms of packing?
A: Generally, we pack our goods in strip and in bundle, if circular column and angle formwork will in bulk, or as customer request.
Q2. What is your terms of payment?
A: T/T 30% as deposit, the balance made against draft Bill of Lading. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 3-4 weeks after receiving your deposit. If urgent, we will arrange over time work, the delivery time can be 3 weeks. But big quantity of your order the delivery time is depend on you need send in batches or one shipment.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings..
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Contact us
Contact Person: Amy Zhao
Tel: +86(22)83973806
Fax: +86(22)83973806
Mobile & Whatsapp:+86 13929567615
Email: amy(at)
Skype: amyfighting3