Tianjin Shisheng Construction Wall Types Concrete Scaffold Steel Formwork
USD $29 - $35 /Square Meter
Min.Order:100 Square Meters
Shisheng Scaffolding & Formwork Co., Ltd.
Tianjin Shisheng Light Scaffolding Steel Wall Decking Formwork
Tianjin Shisheng Promotional Structural Wall Concrete Slab Formwork
Tianjin Shisheng Good Quality Painted Construction Slab Steel Frame Formwork
Tianjin Shisheng Good Quality Construction Shuttering Steel Formwork
Tianjin Shisheng Hot Sale Painted Concrete Column Steel Pillar Formwork
MF-023 Scaffolding Steel Concrete Wall Slab Formwork Shutters
Tianjin Shisheng Construction Wall Types Concrete Scaffold Steel Formwork
Introduction of Steel Formwork
1.Concrete metal formwork is made of Q235 steel plate which is heavy/light duty formwork system for concrete wall, beam, slab and column.
2.There are some ribs in the middle of metal formwork which can strengthen the formwork more steady.
3.Coined edge can help to form a perfect concrete finish without bubbles.
4.Metal formwork is spray painted to against rustiness which can be reusable for many times.
5.Metal formwork is the all-round panel for many construction areas.
Features
Strong build : to support heavy weight and high quality finish
compatible : compatible to suit any flat surface architectural and structural features
Reusable: can be re used up to 300 times
Recyclable : can be 100% recyclable
Specification
Code | Length(mm) | Width(mm) | Height(mm) | Thickness(mm) | Surface treatment |
F2018 | 1800 | 200 | 55 | 3 | Panited |
F2015 | 1500 | 200 | 55 | ||
F2012 | 1200 | 200 | 55 | ||
F2009 | 900 | 200 | 55 | ||
F2007 | 750 | 200 | 55 | ||
F2006 | 600 | 200 | 55 |
Code | Length(mm) | Width(mm) | Height(mm) | Thickness(mm) | Surface treatment |
F3018 | 1800 | 300 | 55 | 3 | Painted |
F3015 | 1500 | 300 | 55 | ||
F3012 | 1200 | 300 | 55 | ||
F3009 | 900 | 300 | 55 | ||
F3007 | 750 | 300 | 55 | ||
F3006 | 600 | 300 | 55 |
Code | Length(mm) | Width(mm) | Height(mm) | Thickness(mm) | Surface treatment |
F1518 | 1800 | 150 | 55 | 3 | Panited |
F1515 | 1500 | 150 | 55 | ||
F1512 | 1200 | 150 | 55 | ||
F1509 | 900 | 150 | 55 | ||
F1507 | 750 | 150 | 55 | ||
F1506 | 600 | 150 | 55 |
Code | Length(mm) | Width(mm) | Height(mm) | Thickness(mm) | Surface Treatment |
F1218 | 1800 | 125 | 55 | 3 | Painted |
F1215 | 1500 | 125 | 55 | ||
F1212 | 1200 | 125 | 55 | ||
F1209 | 900 | 125 | 55 | ||
F1207 | 750 | 125 | 55 | ||
F1206 | 600 | 125 | 55 |
Accessories for Connecting the Formwork
Picture of Flat Formwork
Application
Q1. Are you a manufacture or trader?
A: We are the We are the manufacturer of construction materials for decade years , SS Group do domestic market and export business.
Q2. What your payment terms?
T/T 30% in advance,70% will be before shipment under FOB.
T/T 30% in advance by,70% against the copy of BL under CIF.
T/T 30% in advance by,70% LC at sight under CIF.
Q3.Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
Q4. Can we visit your factory?
A: Of course. You are walmly welcome. Before come to China, please contact us and we will arrange everything we can for you.
Q5. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock or it is 3-4 weeks if the goods are not in stock, it is according to quantity.
Name:Bright Yu
Tel: +86(22)83973806
Fax: +86(22)83973806
Mobile/Whatsapp: +86 15130735828
QQ:1015541985
E-mail:Bright(@)
Skype:Bright0102
Variety of models can customize according to your specification requirement.
Welcome to visit our factory at any time.