SD-1414 Tianjin Shisheng Metal Scaffolding Plank Platform
USD $4 - $13 /Piece
Min.Order:1 Piece
Shisheng Scaffolding & Formwork Co., Ltd.
SD-1379 2019 Tianjin Shisheng Manufacturer Scaffold Steel Catwalk
SD-1375 Tianjin Shisheng High Quality Steel Catwalk For Scaffolding
MD-006 Worthy Buying Construction Materials Punched Galvanized Metal Decking
MD-007 Chinese Manufacturer Building Materials Perforated Galvanized Metal Decking
MD-001 Scaffolding Punched Concrete Metal Deck For Hot Selling
Applications of scaffolding planks in construction: | ||||
1.Scaffolding plank is the main parts of scaffolding system which is | ||||
convenient for workers to walk on high building. | ||||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | ||||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist | ||||
environment. | ||||
4. Various size of scaffolding plank could be customed. | ||||
Advantage of scaffolding planks used for construction: | ||||
1.durable & stable | ||||
2.good bearing capacity | ||||
3.low cost, high quality | ||||
4.Excellent security function | ||||
5.easy to assemble & dismantle | ||||
6.long durability, the working life can up to 5-8 years | ||||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
Specifications | ||||
Name | Metal Deck /Decking /Plank /Walk Board | |||
Place of Origin | Tianjin, China (Mainland) | |||
Size | (more customized size available) | |||
Length (mm) | 1000 | 1500 | 2000 | (3000;4000) |
Width (mm) | 210 | 240 | 250 | (300;420;480;500) |
Height(mm) | 38 | 45 | 50 | |
Thickness(mm) | 1 | 1.1 | 1.2 | (1.5;1.8;2.0) |
Shape(Rib) | A.General Rib | B.V Stiffener | ||
Material | Q195-Q235 | |||
Good Market | Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world | |||
Cerification | ISO9001:2008,SGS etc. | |||
Surface Finishing | pre-galvanized (Zinc Coated :60g/m2) | |||
Technique | automatic productive assembly line | |||
MOQ(Minimum Order Quantity) | pcs | |||
Payment | L/C at sight ;T/T | |||
Package | packed in bulk or in bundle. shipped by container or as client's request | |||
Production Capacity | 100000 pcs / month |
Scaffolding Metal Decking Paper Drawing
Scaffolding Metal Decking Production Process
Since 2001, we has been specialized in manufacturing scaffolding props, scaffolding pipes, kwik stage/ringlock/cuplock/frame scaffoldings, steel planks, steel formwork parts,couplers and accessories. We have more than 16 years of production and export experience. All of our products comply with international quality standards and are greatly appreciated in a variety of markets around the world.
We have a highly experienced producing team, which maintains top level of every stage of the producing progress. Each team of workers is led by supervisor who monitors day to day works. Automated welding systems are widely used.
Today, we have customers in over 35 countries around the world. Our products are engineered for safety, strength and flexibility to meet international standards within this industry. It is important for structural engineers, scaffolding factories and formwork specialists. In terms of working processes, we have expertise in iron casting, steel forging and thread rolling. We have a complete quality control system, which guarantees the high quality of our products and makes sure all progress is made to schedule.
With all our technical knowledge and capacity, if you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients in the near future.
1. Are you a trader or manufacturer?
Manufacturer with an exporting office.
2. What's your payment terms?
TT, L/C at sight 100%, Trade Assurance.
3. What's your MOQ?
A full 20ft container.
4. What's your relative products?
Scaffolding and formwork products(Steel Prop, Steel Plank, Steel Pipe, Scaffolding Frame, Steel Formwork, Euro Formwork, Ringlock, Cuplock Scaffolding and accessories)
5. What's your history?
Our factory founded over 16 years, with more than 5 years exporting experience.
6. How about your after-sale service?
With professional team 7days and 24hours service to solve customer queries.
7. What's your main market?
Europe,Australia, South Asia, South America, Africa, Middle East etc.
8. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 3-4weeks if the goods are not in stock, it is according to quantity.
9. Could we visit your factory?
Warmly welcome visit our factory at any time, will arrange the professional team to follow up.
Business Manager: Amy Zhao
Tel:+86 (22) 83973806
Fax:+86(22) 83973806
Email: amy(@)
Skype: amyfighting3
Facebook: /amy.zhao.37853734
Tianjin Shisheng Scaffolding & Formwork Group – China Operation
Welcome visit our factory at any time!